Tracking the Government’s 100-Point Plan (50 Days)

"

Reform Agenda (Nepali) Reform Agenda (English) Status Remarks Sources
Shared Commitment, Coordination, and Public Trust (3 completed, 5 ongoing)
सम्वत् २०८२ फागुन २१ मा सम्पन्न आम निर्वाचनलाई स्वच्छ, निष्पक्ष र स्वतन्त्र वातावरणमा सफलतापूर्वक सम्पन्न गराउन योगदान पुर्‍याउने तत्कालीन सुशीला कार्की नेतृत्वको सरकार, निर्वाचन आयोग, सुरक्षा निकाय, कर्मचारी, सञ्चारकर्मी तथा सम्पूर्ण मतदाताप्रति हार्दिक आभार प्रकट गर्ने। Express gratitude to all who contributed to the free and fair conduct of the Falgun 21, 2082 general elections including the Sushila Karki caretaker government, Election Commission, security forces, civil servants, media, and voters. Timeline: Immediate (no specific deadline) Completed
Show Remarks
This is more of a declaratory point with no specific action deadline and no verifiable government output. It functions more as a political framing rather than a measurable reform.
Government Unveils Ambitious 100 Point Roadmap For Effective Governance
सरकारको समग्र कार्यसम्पादनलाई नतिजामुखी, प्रभावकारी, मापनयोग्य र जवाफदेही बनाउन तथा नागरिक जीवनमा प्रत्यक्ष सुधार ल्याउने ढाँचामा रूपान्तरण गर्न नतिजामा आधारित शासकीय प्रविधि (Delivery-Based Governance) लागू गर्ने। यसको लागि प्रत्येक मन्त्रालयले ७ दिनभित्र प्रमुख १० कार्य, तिनका समयसीमा, जिम्मेवार अधिकारी र प्रमुख कार्यसम्पादन सूचकसहितको कार्ययोजना तयार गरी कार्यान्वयनमा लैजाने। ती कार्यहरूको मासिक प्रगति प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालयमा पेश गर्ने व्यवस्था मिलाई उक्त कार्यालयमार्फत नियमित अनुगमन, मूल्याङ्कन तथा सार्वजनिक रिपोर्टिङ सुनिश्चित गर्ने। Implement Delivery-Based Governance — each ministry prepares an action plan within 7 days listing top 10 tasks, responsible officers, deadlines, and KPIs. Monthly progress reports submitted to the Prime Minister's Office. Timeline: 7 days (for ministry action plans). Completed
Show Remarks
All the ministries did submit their 10-point action plan within the 7-day deadline which was confirmed by media reports citing the PM's Office spokesperson. However, the individual plans are not yet publicly available, which limits independent tracking. The government had previously attempted a similar delivery unit framework under the Dahal government which largely failed to produce public reporting.
All Ministries Submit Reform Action Plans Prime Ministers Office To Monitor…
नेपालको संविधानको मूल मर्म, लोकतान्त्रिक प्रणालीको सुदृढीकरण तथा निर्वाचनमार्फत व्यक्त जनादेशलाई संस्थागत रूपले कार्यान्वयन गर्न निर्वाचनमा सहभागी सबै राजनीतिक दलका घोषणापत्र, वाचापत्र तथा प्रतिबद्धतापत्रहरूमा समावेश कार्यान्वयनयोग्य विषयहरूको विश्लेषण गरी “राष्ट्रिय प्रतिबद्धता” तयार गर्ने एवं सोमा नेपाल सरकारको साझा स्वामित्व स्थापित गर्ने। उक्त प्रतिबद्धतालाई वार्षिक नीति तथा कार्यक्रम, बजेट तथा सुधार एजेण्डासँग आबद्ध गरी तत्कालैदेखि कार्यान्वयन गर्न तत्काल प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालय अन्तर्गत आवश्यक संरचना स्थापना गरी जिम्मेवारी दिने। Synthesize implementable commitments from all parties' manifestos into a "National Commitment," establish joint government ownership, and link it to annual policy, budget, and reform agenda. Immediate implementation structure to be established under the PM's Office. Timeline: Immediate Ongoing
Show Remarks
The government studied the manifestos of the six nationally recognized parties and produced an 18-point National Commitment. The parties were asked to submit feedback by April 23.
Everything You Need To Know About Balen Governments 100 Point Governance…
Government Unveils 18 Point National Commitment Draft
देशको दीर्घकालीन राजनीतिक तथा संस्थागत सुधार, निर्वाचन प्रणाली लगायतका विषयमा संविधान संशोधन सम्बन्धी विषयहरूमा राष्ट्रिय सहमति निर्माण गर्न प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालयले सात दिनभित्र “संविधान संशोधन बहस पत्र” तयार गर्न कार्यदल गठन गर्ने तथा उक्त बहस प्रक्रियालाई सहभागितामूलक, पारदर्शी र तथ्यमा आधारित बनाउने। Form a task force within 7 days to prepare a "Constitutional Amendment Debate Paper" to build national consensus on long-term political, institutional, and electoral reforms. The process will be participatory, transparent, and evidence-based. Timeline: 7 days (task force formation) Completed
Show Remarks
The task force was formed within 7 days as committed.
Everything You Need To Know About Nepals Constitutional Amendment Debate
Ruling Party Apologises To Dalits For Historical Injustice But Communities…
दलित तथा ऐतिहासिक रूपमा बहिष्कृत समुदायमाथि राज्य, समाज र नीतिगत संरचनाबाट भएका अन्याय, विभेद र अवसरवञ्चनाको औपचारिक स्वीकारोक्ति गर्दै सामाजिक न्याय, समावेशी पुन:स्थापना र ऐतिहासिक मेलमिलापको आधार तयार गर्न १५ दिनभित्र राज्यका तर्फबाट औपचारिक क्षमायाचनासहित सुधारमुखी कार्यक्रम घोषणा गर्ने। Issue a formal state apology to Dalit and historically excluded communities within 15 days acknowledging injustice, discrimination, and deprivation by state, social, and policy structures alongside a reform-oriented programme announcement. Timeline: 15 days Ongoing
Show Remarks
This remains one of the more closely watched undelivered commitments. RSP Chairman Rabi Lamichhane offered a verbal apology on behalf of the party and the government during the first session of the parliament. However, the government's own 15-day dealine for a formal state apology with a formal state apology passed without any traceable official notification.
Ruling Party Apologises To Dalits For Historical Injustice But Communities…
संवत् २०८२ भदौ २३ र २४ मा भएको जेन-जी (Gen Z) आन्दोलनका क्रममा भएका घटनाबाट प्रभावित परिवार र नागरिकहरूको न्याय, पुन:स्थापना र राज्यप्रतिको विश्वास पुन:स्थापना गर्न एकीकृत पहल गर्ने। यस पहल अन्तर्गत शहीदका परिवार तथा घाइतेहरूको तथ्याङ्क सङ्कलन तथा प्रमाणीकरण गरी सम्मानजनक पुन:स्थापना, जीवनयापनको सुरक्षा र सामाजिक संरक्षण सुनिश्चित गर्न १०० दिनभित्र योग्यताअनुसार सरकारी, सार्वजनिक र निजी क्षेत्रमा रोजगारीका अवसर, सीप विकास, मनोसामाजिक परामर्श तथा पुन:स्थापना सहायता समेटिएको समन्वयात्मक प्याकेज कार्यान्वयन गर्ने; साथै उक्त आन्दोलनका क्रममा भएका घटनाको सत्यतथ्य छानबिन गर्न गठित गौरीबहादुर कार्की आयोगको प्रतिवेदनका आधारमा दोषी व्यक्ति तथा पक्षहरूमाथि प्रचलित कानूनबमोजिम आवश्यक अनुसन्धान, कारबाही र अभियोजन प्रक्रिया तत्काल अघि बढाउने। Implement a comprehensive rehabilitation package for Gen-Z movement-affected families and citizens within 100 days including employment, skills development, psychosocial counselling, and rehabilitation support. Also expedite prosecution based on the Gauri Bahadur Karki Commission's report. Timeline: 100 days Ongoing
Show Remarks
This is a 100-day commitment still in progress. Early signs of implementation are visible. Nepal Electricity Authority, Nepal Airlines, and other public enterprises have begun absorbing martyr family members as employees. However, the comprehensive package (psychosocial counselling, skills development, private sector employment) has no publicly released implementation plan with timelines
Eight More Members Of The Families Of Martyrs In The Genji Movement Will Be…
Nepal Announces Rs 15Mn Relief For Gen Z Protest Martyrs Amid Historic…
संवत् २०८२ भाद्र २४ गते घटेको घटनाको सत्यतथ्य छानबिन गर्न एक उच्चस्तरीय छानबिन समिति एक हप्ताभित्र गठन गर्ने। उक्त समितिलाई घटनासम्बन्धी सम्पूर्ण विवरण सङ्कलन, विश्लेषण तथा जिम्मेवार पक्ष पहिचान गरी निश्चित समयसीमाभित्र प्रतिवेदन पेश गर्न कार्यादेश दिने तथा समितिको सिफारिसका आधारमा आवश्यक थप कारबाही प्रक्रिया अघि बढाउने। Form a high-level investigation committee within one week to investigate the truth of events on and after Bhadra 24 (September 9), 2082/2025. The committee will collect all details, identify responsible parties, and submit a report within a fixed timeframe. Timeline: 7 days (one week) Ongoing How The Karki Commissions Findings Sparked Arrests And A Political Showdown
विभिन्न आयोगका प्रतिवेदनहरू केवल अभिलेखमा सीमित रहने र कार्यान्वयन कमजोर हुने समस्या समाधान गर्न ३० दिनभित्र सम्बन्धित प्रतिवेदनका सिफारिसहरू कार्यान्वयन गर्न आवश्यक कानूनी, प्रशासनिक र अभियोजन प्रक्रिया सुरु गर्ने। Initiate the necessary legal, administrative, and prosecution processes to implement recommendations from past commission reports which have historically remained confined to records within 30 days. Timeline: 30 days Ongoing
Show Remarks
The implementation of the Karki Commission report (arrests of Oli and Lekhak) is the most visible example of this reform being acted on. However, Nepal has dozens of other commission reports gathering dust. Including commissions on enforced disappearances and truth and reconciliation, whose implementation this reform also intended to address. No specific mechanism or timeline for those other reports has been publicly announced.
Rising Nepal Daily
Administrative Reform, Restructuring, and Fiscal Discipline (4 completed. 4 ongoing, 3 not started)
मन्त्रालयहरूको सङ्ख्या आवश्यकताभन्दा ठूलो भई चालु खर्च बढेको समस्यालाई समाधान गर्न ३० दिनभित्र मन्त्रालयको सङ्ख्या घटाउने निर्णयसहित मौजूदा नेपाल सरकार (कार्य विभाजन) नियमावली संशोधन गरी संघीय मन्त्रालयको सङ्ख्या १७ कायम गर्ने। मन्त्रालयहरूको सङ्ख्या पुनरावलोकन गर्ने सन्दर्भमा हाल कायम रहेका दरबन्दीहरूसमेत व्यवस्थापन गर्नुपर्ने भएमा सेवा प्रवाहलाई असर नपर्ने गरी बढुवा व्यवस्थापन गर्ने। सो बमोजिम सेवा निरन्तरताका लागि सङ्क्रमण मार्गचित्र (Transition Roadmap) तयार गर्न, जनशक्ति, बजेट तथा कार्यक्रम लगायतका प्रविधि मिलाउन प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालयमा “पुनर्संरचना व्यवस्थापन सचिवालय” गठन गर्ने। Amend the Government of Nepal (Work Division) Regulations within 30 days to reduce federal ministries to 17. Establish a "Restructuring Management Secretariat" to manage the transition. Timeline: 30 days Completed With The Approval Of The Regulations The Number Of Ministries Decreased From…
सबै सार्वजनिक निकायले सेवा प्रवाहमा विद्यमान दोहोरोपन, जटिलता तथा अनावश्यक प्रक्रियाका कारण सेवा प्रवाह ढिलो, खर्चिलो र अप्रभावकारी भएको अवस्थालाई अन्त्य गर्न आ-आफ्ना निकायमा प्रचलनमा रहेका प्रक्रियाहरूको व्यापक समीक्षा गरी अनावश्यक तथा दोहोरिएका प्रक्रियाहरू हटाउन, निर्णय प्रक्रियामा रहेका बहु-स्वीकृति तहलाई बढीमा तीन तहमा सीमित गर्न तथा Business Process Re-engineering (BPR) मार्फत सम्पूर्ण सेवा प्रवाहलाई सरल, छिटो तथा परिणाममुखी बनाउनका लागि आवश्यक कार्यविधि, मापदण्ड तथा अनुगमन प्रणाली ३० दिनभित्र तयार/संशोधन गरी लागू गर्ने। कानूनी व्यवस्था गर्नुपर्ने अवस्थामा सो अवधिभित्र कानून संशोधनको मस्यौदा तयार गर्ने। Conduct comprehensive review of procedures across all public entities; eliminate unnecessary and duplicated steps; limit multi-level approvals to three tiers; use Business Process Re-engineering (BPR) to simplify and speed up service delivery. Within 30 days. Timeline: 30 days Ongoing
Show Remarks
This reform is a cross-cutting administrative directive requiring every public entity to self-review. The General Administration Ministry issued criteria for employee recruitment and structural reform which is related groundwork. However, there is no public confirmation that a comprehensive BPR review has been completed across all entities within 30 days, or that draft legal amendments have been prepared where needed.
Government Unveils Ambitious 100 Point Roadmap For Effective Governance
Regarding The Implementation Of Business Process Re Engineering
General Creates Criteria For Employee Recruitment Aims To End Structural…
नेपाल सरकार अन्तर्गत रहेका अनुत्पादक, दोहोरो कार्यक्षेत्र भएका तथा अनावश्यक वित्तीय भार सिर्जना गर्ने बोर्ड, समिति, आयोजना तथा संस्थागत संरचनाहरूको समग्र मूल्याङ्कन गरी खारेज, एकीकरण वा पुनर्संरचना गर्न प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालय, अर्थ मन्त्रालय, उद्योग, वाणिज्य तथा आपूर्ति मन्त्रालय र सङ्घीय मामिला तथा सामान्य प्रशासन मन्त्रालयका प्रतिनिधिहरू रहेको एक उच्चस्तरीय कार्यदल गठन गर्ने तथा सो कार्यदललाई एक महिनाभित्र स्पष्ट सिफारिससहितको प्रतिवेदन पेश गर्न कार्यादेश दिने। Form a high-level task force to evaluate unproductive and financially burdensome boards, committees, projects, and institutional structures and submit clear recommendations for dissolution, consolidation, or restructuring within one month. Timeline: 30 days (one month) Completed Rising Nepal Daily
सार्वजनिक प्रशासनलाई पूर्णतः राजनीतिक हस्तक्षेपबाट मुक्त गर्दै निष्पक्ष, तटस्थ र नागरिकप्रति उत्तरदायी बनाउने। यस उद्देश्यका लागि निजामती कर्मचारी, शिक्षक, प्राध्यापक तथा सबै राष्ट्रसेवकले कुनै पनि दल, समूह वा स्वार्थ केन्द्रसँगको प्रत्यक्ष वा अप्रत्यक्ष आबद्धताबाट मुक्त भई कार्यसम्पादन गर्न अनिवार्य गर्ने र उल्लङ्घन भएमा प्रचलित कानूनबमोजिम कडाइका साथ विभागीय कारबाही गर्ने। साथै, सार्वजनिक प्रशासनमा दलीय ट्रेड युनियन खारेज गरी अवाञ्छित हस्तक्षेप र अनौपचारिक दबाबको अन्त्य गर्दै निर्णय प्रक्रिया तथा सेवा प्रवाहलाई प्रभावकारी बनाउने। यसका लागि आवश्यक कानूनी व्यवस्था विशेषतः सङ्घीय निजामती सेवा विधेयक ४५ दिनभित्र तर्जुमा गर्ने। Make public administration free from political interference. Civil servants, teachers, professors, and all government employees must be free from party affiliation. Party trade unions in public administration will be abolished. Draft the Federal Civil Service Bill within 45 days. Timeline: 45 days Completed
Show Remarks
Two important points to consider. First, the previous parliament had already passed a Federal Civil Service Bill 2082 in June 2025 under the Oli government, which was awaiting presidential certification when parliament was dissolved. The Balen government's new draft is a different document with 48 new provisions including the trade union abolition clause. Second, civil servant employee organisations have already pushed back formally, calling the trade union ban unconstitutional. This will face legal challanges as the Superme Court issued an interim order that stopped the government from scrapping trade unions
Nepal Drafts Civil Service Bill Raising Retirement Age To 60 Tightening Psc…
Employee Organizations Unhappy With Governments Agenda To Abolish Party…
Rising Nepal Daily
विद्यमान भ्रष्टाचार, ढिलासुस्ती तथा सेवाग्राहीप्रति असहज व्यवहारजस्ता प्रवृत्तिहरूको सुधार गर्दै कर्मचारीतन्त्रलाई उत्तरदायी, सेवामुखी, जनमुखी र उदाहरणीय बनाउन कर्मचारी आचारसंहिताको अक्षरशः कार्यान्वयन गर्ने। साथै, कर्मचारीहरूले व्यावसायिक मर्यादा कायम राख्दै निष्पक्ष, तटस्थ र सरकारका निर्णयहरूको प्रभावकारी कार्यान्वयनमा समर्पित भई काम गर्ने वातावरण सुनिश्चित गर्ने। Strictly enforce the Code of Conduct for Civil Servants to make employees accountable, service-oriented, people-friendly, and exemplary. Ensure an environment of professional dignity, impartiality, and effective implementation of government decisions. Timeline: Immediate Ongoing
Show Remarks
The Code of Conduct for Civil Servants exists under existing law (Civil Service Act 2049 and related regulations) and does not require new legislation to enforce. What this point commits to is stricter enforcement. Which is inherently harder to verify than a new policy announcement. There is no publicly accessible monitoring report or action log showing how many violations have been acted on since March 28.
Notices 20260424111647833.Pdf
What Came Up About Federalism In The Governments 100 Point Plan
सङ्घ, प्रदेश तथा स्थानीय तहको सङ्गठन तथा व्यवस्थापन सर्वेक्षणको राष्ट्रिय मापदण्ड १५ दिनभित्र तर्जुमा गरी स्वीकृत गर्ने। Draft and approve national standards for organisational and management surveys of federal, provincial, and local government levels within 15 days. Timeline: 15 days Completed
Show Remarks
This reform builds on existing frameworks. MoFAGA has previously published Organisation and Management Survey directives (2066 BS and 2067 BS). The new national standard is intended to be uniformly applicable across federal, provincial, and local tiers which is the new element.
What Came Up About Federalism In The Governments 100 Point Plan
शिक्षकको सिटरोल दर्ता तथा अवकाशपछिका सेवा सुविधा व्यवस्थापन आगामी आर्थिक वर्षदेखि प्रदेशको शिक्षा हेर्ने मन्त्रालयबाटै हुने व्यवस्था मिलाउने। Transfer management of teachers' payroll status and post-retirement service benefits from the centre to provincial-level education ministries starting from the next fiscal year. Timeline: Next fiscal year (FY 2082/83) Not Started
Show Remarks
This reform is not yet in effect as it is scheduled to start from the next fiscal year
What Came Up About Federalism In The Governments 100 Point Plan
कर्मचारीहरूको कार्यसम्पादनलाई परिणामसँग जोड्न प्रत्येक पदको कार्यविवरणको वस्तुनिष्ठ कार्यसम्पादन सूचक सम्बन्धित सार्वजनिक निकाय/कार्यालयले ४५ दिनभित्र तयार गर्ने। कार्यसम्पादन मूल्याङ्कन कमजोर हुँदा राम्रो र खराब कार्यसम्पादनलाई समान व्यवहार गर्ने प्रवृत्ति हटाउन ९० दिनभित्र कार्यसम्पादनमा आवद्ध उत्तरदायित्व र पुनरावलोकन प्रणाली लागू गर्ने। Each public entity will prepare objective performance indicators for every position within 45 days. A performance-linked accountability and review system will be implemented within 90 days eliminating the tendency to treat good and poor performers equally. Timeline: 45 days (KPIs); 90 days (accountability system) Ongoing One Month Of The Balen Government How Many Of The 100 Points Related To…
सार्वजनिक निकायको सेवाको गुणस्तर प्रमाणीकरण गर्ने व्यवस्था गरी उत्कृष्ट निकायलाई प्रोत्साहित (Incentivize) गर्न सङ्घीय मामिला तथा सामान्य प्रशासन मन्त्रालयले स्थानीय तहबाट प्रवाह हुने सेवाको गुणस्तर प्रमाणीकरण मापदण्ड ४५ दिनभित्र तयार गर्ने। The Ministry of Federal Affairs and General Administration will prepare quality certification standards for services delivered at the local level within 45 days to certify service quality and incentivise excellent entities. Timeline: 45 days Ongoing
Show Remarks
No publicly available government document confirming the preparation of quality certification standards for local-level services has been identified. This reform appears to be in process but not yet publicly verified as complete.
Nepal Unveils 100 Point Reform Agenda Under Balendra Shah Signals Gen Z Led…
सरकारी कार्यालयहरूको भौतिक पूर्वाधार र स्तरीकृत विन्यास (Standard Layout) का लागि शहरी विकास मन्त्रालयले दुई महिनाभित्र न्यूनतम मापदण्ड तर्जुमा गरी १०० दिनभित्र कार्यान्वयनमा लैजाने। The Ministry of Urban Development will formulate minimum standards for the physical infrastructure and standard layout of government offices within two months, and implement them within 100 days. Timeline: 2 months (standards); 100 days (implementation) Not Started
Show Remarks
The two-month deadline for drafting standards falls around May 28, 2026. There is no publicly available draft or notice from the Ministry of Urban Development on this reform.
Government Unveils Ambitious 100 Point Roadmap For Effective Governance
कर्मचारीहरूको अद्यावधिक डिजिटल प्रोफाइल तयार गरी नियुक्ति, पदस्थापना, सरुवा, तालिम, बढुवा तथा अवकाशसम्मको व्यवस्था अनुमानयोग्य र स्वचालित बनाउन सङ्घीय मामिला तथा सामान्य प्रशासन मन्त्रालयले तीन महिनाभित्र कर्मचारी व्यवस्थापन सूचना प्रणाली (Personnel Management Information System – PMIS) को आर्किटेक्चर तयार गर्ने। Ministry of Federal Affairs and General Administration will prepare the architecture for a Personnel Management Information System (PMIS) within three months to digitise and automate the full employee lifecycle from recruitment to retirement. Timeline: 3 months Not Started Nepal Unveils 100 Point Reform Agenda Under Balendra Shah Signals Gen Z Led…
Public Service Delivery and Grievance Management (1 completed, 6 ongoing, 1 not started)
नागरिकलाई सरकारी सेवा लिन धेरै कार्यालय धाउनुपर्ने, प्रक्रियागत झन्झट व्यहोर्नुपर्ने तथा समय र लागत दुवै बढ्ने अवस्थाको अन्त्य गर्न प्रमुख शहरहरूमा एजेन्सीफिकेसन (Agencyfication) मोडालिटीमा नागरिक सेवा केन्द्र सञ्चालन गर्ने। त्यस्ता केन्द्रहरूलाई दैनिक कम्तीमा १२ घण्टा सञ्चालन गर्ने व्यवस्था मिलाउने। Operate citizen service centres in major cities in an agency-specific modality with a minimum of 12 hours of daily operation to eliminate citizens' need to visit multiple offices. Timeline: Immediate Ongoing
Show Remarks
This reform is listed as immediate but is operationally complex as most district administration offices lack the staffing for 12-hour shifts. There is no publicly available government circular mandating 12-hour operation and allocating the necessary overtime budget.
Government Unveils Ambitious 100 Point Roadmap For Effective Governance
नागरिकलाई छिटो, सहज र बिचौलिया मुक्त सेवा उपलब्ध गराउन नागरिकता, राहदानी, राष्ट्रिय परिचयपत्र तथा जिल्ला प्रशासन कार्यालयबाट प्रदान हुने सम्पूर्ण सेवाहरूलाई डिजिटल तथा एकीकृत प्रणालीमार्फत सञ्चालन गर्ने, नागरिकताको प्रतिलिपि तथा राहदानी सेवा जुनसुकै जिल्ला प्रशासन कार्यालयबाट प्राप्त गर्न सकिने व्यवस्था तत्काल लागू गर्ने, वडास्तरबाट डिजिटल सिफारिस प्रणाली लागू गर्ने, राष्ट्रिय परिचयपत्रलाई अनिवार्य एकल परिचय प्रणालीका रूपमा प्रयोग गर्ने तथा सबै सेवा प्रक्रियालाई फेसलेस, टाइम-बाउन्ड र ट्र्याकिङ योग्य बनाउने। Make all citizenship, passport, national identity card, and district administration office services fully digital and interlinked. Enable services from any District Administration Office nationwide. Implement digital ward-level recommendation system. Make all service processes faceless, time-bound, and trackable. Timeline: Immediate Ongoing
Show Remarks
The technical integration between the Centralised Citizenship Management Information System (CCMIS) and the National Identity Management Information System (NIMIS) has begun and is expanding.
Nepal Built A Digital Identity App So Why Do Government Offices Still Want…
फ्रन्ट डेस्कमा काम गर्ने सबै कर्मचारीहरूलाई कार्यालयबाट उपलब्ध हुने सबै सेवाहरूको तालिम प्रदान गर्न त्यस्ता कर्मचारीहरूको सूची र तालिमको आवश्यकता सबै कार्यालयहरूले १५ दिनभित्र सङ्घीय मामिला तथा सामान्य प्रशासन मन्त्रालयमा उपलब्ध गराउने। मन्त्रालयले सम्बन्धित तालिम प्रदायक संस्थाहरूसँग समन्वय गरी ६ महिनाभित्र आवश्यक तालिमको व्यवस्था गर्ने। तत्पश्चात पनि सो प्रक्रियालाई प्रत्येक निरन्तर सञ्चालन गर्ने। All offices will submit lists of front-desk employees and their training needs to the Ministry of Federal Affairs and General Administration within 15 days. Training on all available services will be arranged within 6 months. Timeline: 15 days (list submission); 6 months (training delivery) Completed
Show Remarks
The list submission step has been completed offices submitted their front-desk employee lists and training needs to MoFAGA within the 15-day deadline. The actual training delivery (6-month target) is still ongoing
One Month Of The Balen Government How Many Of The 100 Points Related To…
सम्पूर्ण सार्वजनिक सेवाका प्रक्रियालाई डिजिटल, ट्र्याकिङयोग्य र पारदर्शी बनाउन प्रत्येक कार्यालयले एक महिनाभित्र समय र गति (Time and Motion) को अध्ययन गरी कार्यालयको पुनर्विन्यास योजना (Restructuring Plan) तयार गर्ने। Each office will conduct a Time and Motion study within one month and prepare an Office Restructuring Plan to make all public service processes digital, trackable, and transparent. Timeline: 1 month (30 days) Not Started
Show Remarks
The one-month deadline for all offices to conduct Time and Motion studies and produce restructuring plans has passed. There is no publicly available output no aggregated report or dashboard showing how many offices completed the study and what their restructuring plans look like.
देशभरका नागरिकका गुनासो, सुझाव तथा सेवा अनुरोधलाई छिटो, प्रभावकारी तथा परिणाममुखी रूपमा सम्बोधन गर्न २४ घण्टे राष्ट्रिय नागरिक सहायता तथा गुनासो व्यवस्थापन प्रणाली सञ्चालन गर्ने। सो को लागि फोन, मोबाइल एप, पोर्टल तथा सामाजिक सञ्जालमार्फत गुनासो दर्ता गर्न सकिने बहु-च्यानलको व्यवस्था मिलाउने। Establish a 24-hour National Citizen Assistance and Grievance Management System accessible via phone, mobile app, portal, and social media to address citizen complaints, suggestions, and service requests quickly and with tangible results. Timeline: Immediate Ongoing
Show Remarks
The "Hello Sarkar" hotline (1111) has existed since a previous government but has had variable response rates. The commitment here is to upgrade it into a multi-channel platform with real-time ministerial coordination which is substantially different from the existing system. There is no publicly released evidence of a new upgraded system being live.
Nepal Unveils 100 Point Reform Agenda Under Balendra Shah Signals Gen Z Led…
हेलो सरकार संयन्त्रलाई स्तरोन्नति गरी नागरिक सम्वादको प्लेटफर्मका रूपमा विकास गर्ने तथा एकीकृत ड्यासबोर्डमार्फत सबै मन्त्रालयसँग प्रत्यक्ष समन्वय गरी गुनासो समाधानको प्रगति real-time मा अनुगमन गर्ने। Upgrade the "Hello Sarkar" (Hello Government) contact line into a full citizen dialogue platform with an integrated real-time dashboard for direct coordination with all ministries on grievance resolution. Timeline: Immediate Ongoing
Show Remarks
This is closely related to Reform 24. The integrated real-time dashboard across all ministries is the key new element. Previous governments had announced dashboard-based monitoring (notably the Dahal government's Digital Dashboard initiative) which was never fully operationalised. The current status of the Hello Sarkar upgrade beyond the existing hotline service is not publicly confirmed.
Government Unveils Ambitious 100 Point Roadmap For Effective Governance
पासपोर्ट, नागरिकता, सवारी चालक अनुमति पत्र लगायतका सेवाहरू नागरिकलाई छिटो, सहज र बिचौलिया-मुक्त तरिकाले पूर्वानुमानयोग्य समय (Predictable Time) मा उपलब्ध गराउने व्यवस्था लागू गर्ने तथा सम्पूर्ण सेवा प्रक्रियालाई मुहारविहीन र समयबद्ध (faceless, time-bound) र डिजिटल प्रणालीमा रूपान्तरण गर्ने। Make passport, citizenship, and driving license services available in a fast, easy, and intermediary-free manner with predictable delivery times. Transform all service processes into faceless, time-bound, and fully digital systems. Timeline: Immediate Ongoing Khabarhub
सरकारी सेवा घरमै उपलब्ध गराउने उद्देश्यले हुलाक सेवालाई आधुनिकीकरण गरी “Government Courier Service” का रूपमा विकास गर्ने, जसमार्फत पासपोर्ट, नागरिकता प्रतिलिपि, लाइसेन्स लगायतका सरकारी कागजातहरू/सामग्रीहरू घरमै पुर्‍याउने व्यवस्था १०० दिनभित्र लागू गर्ने। Modernize Nepal's postal service into a "Government Courier Service" that delivers documents such as passports, citizenship copies, and licences directly to citizens' doorsteps. To be implemented within 100 days. Timeline: 100 days Ongoing
Show Remarks
The 100-day deadline for this reform falls around July 5, 2026. The 100-day deadline for this reform falls around July 5, 2026
Nagarik App Passport License Application
Digital Governance, Data Governance, and Communication (2 ongoing, 4 not started)
सार्वजनिक सेवा प्रवाहलाई छिटो, पारदर्शी, कागजरहित तथा अन्तर-आबद्ध बनाउन सङ्घ, प्रदेश र स्थानीय तहका सबै सरकारी निकायहरूमा १०० दिनभित्र विद्यमान GIOMS प्रणालीलाई सुदृढ र प्रयोगकर्तामैत्री बनाउने। Strengthen and make the existing GIOMS (Government Integrated Office Management System) more user-friendly across all federal, provincial, and local government entities within 100 days to make service delivery fast, transparent, paperless, and interlinked. Timeline: 100 days Ongoing
Show Remarks
GIOMS (Government Integrated Office Management System) has been in place since 2012 and has been chronically underfunded and underused. The 100-day deadline for a meaningful upgrade across all three tiers of government is ambitious. There is no publicly released implementation plan or progress report.
Nepal Unveils 100 Point Reform Agenda Under Balendra Shah Signals Gen Z Led…
सरकारसँग पहिलेनै भएको नागरिकको वैयक्तिक विवरण (जस्तै: नागरिकता नम्बर हाल्दा नाम/ठेगाना) पुनः सोध्नुको सट्टा Auto-fill हुने व्यवस्था सम्बन्धित कार्यालयहरूले आफ्ना प्रणालीहरूमा ६० दिनभित्र गर्ने। नागरिकले आफ्नो विवरण (जस्तै: नागरिकता नम्बर) सरकारलाई एक पटक दिएपछि, अन्य सरकारी निकायले सोही डेटा प्रयोग गर्ने वातावरण मिलाउने। Implement auto-fill arrangements in government offices within 60 days so that personal details already held by the government (such as name and address linked to a citizenship number) are not asked for again. "Submit once only" principle to be implemented. Timeline: 60 days Not Started
Show Remarks
The 60-day deadline falls around May 27, 2026
Nepal Rolls Out Integrated Digital System Faces Acceptance Problem With…
सरकारी एप वा पोर्टलहरू अपाङ्गता भएका व्यक्ति र कम प्राविधिक ज्ञान भएका नागरिकले पनि चलाउन सक्ने गरी सरल बनाउने कार्य १०० दिनमा सम्पन्न गर्ने। Make government apps and portals simple enough for persons with disabilities and citizens with limited technical literacy to use. To be completed within 100 days. Timeline: 100 days Not Started
Show Remarks
Nepal's government apps and portals currently have no publicly available accessibility audit or compliance framework.
अनलाइन आवेदन प्रणालीलाई सहज बनाउन नागरिक एपमार्फत आवेदन दिने व्यवस्था मिलाउने। यसरी नागरिक एपमार्फत आवेदन दिँदा व्यक्तिले आफ्नो फोनमा रहेको एपले Locally Store गरेको विवरण वा अन्य प्रणालीबाट प्राप्त विवरणको आधारमा Form Fill-up गर्ने व्यवस्था मिलाउने। तर नागरिक एपले Centrally Data Store गर्न भने नमिल्ने बनाउने। यस्तो व्यवस्थाबाट प्रहरी प्रतिवेदन, राहदानी र सवारीचालक अनुमति पत्रका लागि आवेदन गर्न सकिने व्यवस्था ४५ दिनभित्र मिलाउने। Enable passport, driving licence, and police report applications through the Nagarik App (Citizen App) using locally stored or pre-verified information to auto-fill forms. The app will not centrally store data. To be implemented within 45 days. Timeline: 45 days Ongoing
Show Remarks
The Ministry of Communication and IT approved a 10-point digital reform plan in April 2026 that includes Nagarik App integration for these services.
Nepal Built A Digital Identity App So Why Do Government Offices Still Want…
Nagarik App Passport License Application
आवेदन दिएको सेवा प्राप्त गर्न भौतिक रूपमा उपस्थित हुनुपर्ने अवस्था भएमा उपलब्ध मिति र समय मध्ये नागरिकलाई आफ्नो सुविधाको दिन र समयको Appointment लिन सक्ने व्यवस्था गरी सोही अनुसार नागरिक सेवा केन्द्र वा सरकारी निकायमार्फत सेवा प्रवाह गर्ने व्यवस्था तीन महिनाभित्र मिलाउने। Create an appointment system within 3 months allowing citizens to book their preferred date and time for services requiring physical presence, and receive services through citizen service centres or government entities accordingly. Timeline: 3 months (90 days) Not Started
Show Remarks
Nepal's existing digital signature framework is certificate-based under the Electronic Transactions Act, 2063 (2006). Enabling NID card or OTP-based e-signatures requires amendments to this act.
Digital Signature हाल Certificate को माध्यमबाट हुने गरेकोमा NID Card, Biometric वा OTP को प्रयोग गरी e-signature गरी नागरिकले आफ्नो विवरण बुझाउन सक्ने व्यवस्था गर्ने। यसको लागि राष्ट्रिय परिचयपत्र तथा पञ्जीकरण विभागको भौतिक तथा साङ्गठनिक सुदृढीकरण गर्ने। राष्ट्रिय परिचयपत्र (NID) नम्बरलाई आधार बनाई नागरिकका सबै सेवाहरूमा डिजिटल हस्ताक्षरद्वारा प्रमाणीकरण प्रणाली लागू गर्न गृह मन्त्रालयको संयोजकत्वमा अध्ययन गरी एक महिनाभित्र प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालयमा प्रतिवेदन दिने। Enable digital signatures through NID Card, Biometric, or OTP (instead of only through physical certificates) for citizens to submit and authenticate documents electronically. Conduct a study under Home Ministry coordination and submit a report to the PM's Office within one month. Timeline: 1 month (for report) Not Started Nagarik App Passport License Application
Good Governance, Transparency, and Anti-Corruption (2 completed, 1 ongoing, 11 not started)
फाइल कुन टेबुलमा कति समय बस्यो भन्ने ट्र्याकिङ गर्ने र तोकिएको समय नाघेमा माथिल्लो अधिकारीलाई 'अलर्ट' जाने प्रणालीको उपयोग विद्यमान एकीकृत कार्यालय व्यवस्थापन प्रणालीमा ३० दिनभित्र गर्ने। A file-tracking system will be implemented within 30 days in the existing integrated Office Management System – flagging files that exceed their permitted desk time and automatically alerting senior officials. Timeline: 30 days Not Started
Show Remarks
GIOMS was already being rolled out under the previous government. The specific file-tracking/ desk-timer-alert feature is an upgrade on top of GIOMS. There is no public annoucement confirming this specific feature was deployed.
Kathmandu Police File Tracking System Phone Contact With 30000 In 6 Months
Adb Supports Nepal Digital Transformation Toward High Impact Services…
प्रमाणपत्रहरू नागरिकले आधिकारिक मोबाइल एप/नागरिक एप वा इमेलमा 'डाउनलोड' गर्न मिल्ने व्यवस्था १५ दिनभित्र मिलाउने। An arrangement for citizens to download certificates via the official mobile/Nagarik App or email will be in place within 15 days. Timeline: 15 days Not Started
Show Remarks
The director has said that the system is currently in the testing phase and will be fully implemented within the next week. However, the April 11 report was published after the 15-day deadline had already passed. The Nagarik App itself already provided some certificate-download services before this government, so the reform builds on pre-existing infrastructure.
Birth And Marriage Registration Certificates Will Also Be Available On The…
सार्वजनिक सेवा प्रवाहलाई पूर्णरूपमा डिजिटल, एकद्वार र अन्तर-आबद्ध प्रणालीमा रूपान्तरण गर्ने उद्देश्यले “राष्ट्रिय एकीकृत डिजिटल शासन प्लेटफर्म” स्थापना गरी डिजिटल गभर्नान्स ब्लुप्रिन्ट कार्यान्वयन गर्ने। यस अन्तर्गत 'एउटा विवरण एकपटक मात्र बुझाउने' सिद्धान्त अवलम्बन गर्दै सबै तहका सरकारका सेवा, डाटा र प्रणालीहरूलाई एकीकृत गरी डिजिटल सार्वजनिक पूर्वाधारमा आधारित राष्ट्रिय डाटा एक्सचेन्ज प्लेटफर्म स्थापना तथा सञ्चालनको कार्य १०० दिनभित्र प्रारम्भ गर्ने। A "National Integrated Digital Governance Platform" will be established to fully transform public service delivery into a digital, single-window, interlinked system – implementing a Digital Governance Blueprint. Under this, a "submit once only" principle will be adopted for all government tiers, and the establishment and operation of a National Data Exchange Platform based on digital public infrastructure will begin within 100 days. Timeline: 100 days Ongoing
Show Remarks
Funding and implementation have begun through World Bank and Asian Development Bank support

The 100-day deadline extends to approximately late June 2026. The "platform" as described is a rebranding and consolidation of existing systems (GIOMS, Nagarik App, NEGIF). Nepal has had a government interoperability framework (available at nepal.gov.np/eGovInitiatives) since at least 2017. The new commitment calls for a single-window architecture and a National Data Exchange Platform, but no separate launch event or cabinet notice for this platform has been published yet.

Ekantipur
Nepal World Bank Approves 50 Million Digital Transformation Project
नागरिकले एउटै डिजिटल प्लेटफर्ममार्फत सबै सेवा सहज रूपमा प्राप्त गर्न सक्ने व्यवस्था मिलाउन, सेवा प्रवाहमा दोहोरोपनको अन्त्य गर्न, पारदर्शिता अभिवृद्धि तथा समय र लागत उल्लेख्य रूपले घटाउन डिजिटल गभर्नान्स र व्यक्तिगत डाटा संरक्षणसम्बन्धी नीति तथा कानूनको तर्जुमा ६० दिनभित्र गर्ने। Digital governance and personal data protection policy and legislation will be drafted within 60 days to enable citizens to receive all services through a single digital platform, eliminate duplication, improve transparency, and significantly reduce time and cost. Deadline: 60 days Not Started
Show Remarks
The policy drafting process has officially started

Nepal's existing IT law (Electonic Transaction Act, 2063) is widely considered outdated. Multiple replacement drafts have circulated since 2019 without passage into law. The 60-day deadline for this draft was approximately late May 2026. No public announcement of a completed draft has been found.

Nepals Digital Push Faces Rising Cybersecurity Risks Amid Weak Legal Frameworks
Technology Khabar
सूचना प्रविधि तथा डिजिटल गभर्नान्स सम्बन्धी नियम बनाउने र नियमन गर्ने स्वतन्त्र नियामक निकाय (Independent Regulatory Authority) को स्थापनाका लागि आवश्यक कानूनी तथा संस्थागत प्रविधि ६० दिनभित्र गर्ने। The necessary legal and institutional arrangements for establishing an Independent Regulatory Authority for IT and digital governance will be completed within 60 days. Timeline: 60 days Not Started
Show Remarks
Multiple replacement drafts have circulated since 2019 without passage into law. The 60-day deadline for this draft was approximately late May 2026. No public announcement of a completed draft has been found.
Radio Nepal
नेपालको सूचना प्रविधि तथा विद्युतीय शासन प्रणालीमा विद्यमान खण्डीकृत संरचना, अन्तर-आबद्धताको अभाव, मापदण्ड तथा संस्थागत समन्वयको कमजोरी, दक्ष जनशक्ति र प्राविधिक क्षमताको कमी तथा सेवा प्रवाहमा देखिएको अप्रभावकारिता समाधान गरी एकीकृत, सुरक्षित, दक्ष र परिणाममुखी डिजिटल शासन प्रणाली स्थापना गर्न प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालय मातहत रहने गरी सूचना प्रविधि तथा विद्युतीय शासन कार्यालय स्थापना गर्ने कार्य तीन महिनाभित्र सम्पन्न गर्ने। हालको सूचना प्रविधि विभाग खारेज गरी तथा सूचना प्रविधिसम्बन्धी सबै सार्वजनिक निकायहरूलाई यस कार्यालय अन्तर्गत सञ्चालन गर्ने व्यवस्था मिलाउने। To address Nepal's fragmented IT and e-governance structure — including lack of interoperability, weak standards and institutional coordination, shortage of skilled personnel and technical capacity, and ineffective service delivery — an IT and E-Governance Office will be established under the Office of the Prime Minister and Council of Ministers within 90 days. The existing Department of IT will be dissolved, and all IT-related public entities will be brought under this new office. Timeline: 90 days Not Started
Show Remarks
Dissolving a department and establishing a new one under OPMCM requires a Government of Nepal (Work Division) Regulations amendment which is the same mechanism used to reduce ministries to 18 (Reform 9). No gazette notification of this structural change has been found yet. The 90-day deadline extends to late June 2026.
सूचना प्रविधि तथा विद्युतीय शासन विधेयक ६० दिनभित्र तर्जुमा गर्ने। An Information Technology and E-Governance Bill will be drafted within 60 days. Timeline: 60 days Not Started
Show Remarks
A new IT/E-Governance law has been in draft form or under discussion since at least 2016. The latest cycle of drafting began around 2021–2022. The 60-day deadline (late May 2026) has passed. No bill submission to Parliament or to the Ministry of Law for vetting has been publicly confirmed.
Rising Nepal Daily
The Great Digital Leap Forward
National Enterprise Architecture Framework ६० दिनभित्र तयार गर्ने। A National Enterprise Architecture Framework will be prepared within 60 days. Timeline: 60 days Not Started
Show Remarks
Nepal has an older Government Enterprise Architecture (GEA) and Government Interoperability Framework (NEGIF) available on nepal.gov.np/eGovInitiatives. This reform calls for a new, updated national framework. The 60-day deadline is set for late May 2026. No completed framework document has been publicly released.
सञ्चार तथा सूचना प्रविधि मन्त्रालयले सट्टेबाजी एप (Betting App) र त्यससम्बन्धी वेबसाइट २४ घण्टाभित्र बन्द गर्ने। The Ministry of Communication and Information Technology will block betting apps and related websites within 24 hours. Timeline: Immediate Completed
Show Remarks
Though the Criminal Code of Nepal (2017 AD) (2074 BS) outlawed gambling, online gambling platforms were thriving due to heavy advertising. Following MOICT's decision and instruction on March 29, to block online gambling related platforms, NTA coordinated with ISPS for a nationwide shutdown of all online betting and gambling applications and websites operating illegally, with orders to block access and NTA enforcing compliance.
Rising Nepal Daily
Khabarhub
देशमा व्याप्त भ्रष्टाचार, सम्पत्ति लुकाउने प्रवृत्ति तथा दण्डहीनताको अन्त्य गर्न प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालय अन्तर्गत रहने गरी १५ दिनभित्र अधिकारसम्पन्न सम्पत्ति छानबिन समिति गठन गर्ने। सो समितिमा कानून, अर्थ, राजस्व तथा अनुसन्धान क्षेत्रका विज्ञ तथा सम्बन्धित निकायका प्रतिनिधिहरू समावेश गर्ने। सोको लागि आवश्यक कानूनी तथा प्राविधिक संयन्त्र विकास गरी सम्पूर्ण प्रक्रिया पारदर्शी र नतिजामुखी हुने सुनिश्चित गर्ने। उक्त समितिलाई आवश्यक कागजात, विवरण तथा अभिलेख सङ्कलन, विश्लेषण तथा सिफारिस गर्ने लगायतका अधिकार प्रदान गर्ने। पहिलो चरणमा वि. सं. २०६२/६३ देखि हाल (२०८२/८३) सम्म सार्वजनिक पद धारण गरेका प्रमुख राजनीतिक पदाधिकारी तथा उच्चपदस्थ कर्मचारीहरूको सम्पत्ति विवरणको सङ्कलन, प्रमाणीकरण तथा छानबिन गर्ने। दोस्रो चरणमा वि. सं. २०४८ सालदेखि २०६१/६२ सम्मको अवधिमा सार्वजनिक पद धारण गरेका सोही प्रकृतिका पदाधिकारी तथा कर्मचारीहरूको सम्पत्ति छानबिन गर्ने। छानबिन प्रक्रियालाई कानूनी मापदण्ड, प्रमाणमा आधारित तथा निष्पक्ष रूपमा सञ्चालन गर्ने तथा समितिले पेश गरेको प्रतिवेदन तथा सिफारिसहरू सम्बन्धित निकायमार्फत कार्यान्वयन गर्ने व्यवस्था मिलाउने। To end rampant corruption, asset concealment, and impunity, a powerful Asset Investigation Committee will be formed within 15 days under the Office of the Prime Minister and Council of Ministers, comprising legal, financial, revenue, and investigative experts. In the first phase, it will collect, verify, and investigate the asset disclosures of senior political officeholders and high-ranking civil servants who have held public positions from 2062/63 to 2082/83 (BS). In the second phase, the same will be done for those who held public positions from 2048 to 2061/62. Timeline: 15 days Completed
Show Remarks
The committee was formed within the stated timeline and asset disclosures from senior politicians and officials (2062/63–2082/83 phase) are being reviewed.
Government To Form High Powered Property Investigation Committee Within 15 Days
सुशासन प्रवद्र्धन, भ्रष्टाचार नियन्त्रण तथा सार्वजनिक सेवा प्रवाहमा पारदर्शिता र जवाफदेहिता अभिवृद्धि गर्न राष्ट्रिय सतर्कता केन्द्रको पुनर्संरचना योजना ३० दिनभित्र तयार गरी कार्यान्वयनमा ल्याउने। A restructuring plan for the National Vigilance Centre will be prepared within 30 days and implemented to promote good governance, control corruption, and increase transparency and accountability in public service delivery. Not Started
Show Remarks
The reform asks for a formal restructuring plan within 30 days. The NVC has existed since 2002 and has been discussed for reform in multiple past government agendas (including the Deuba government's good governance commitments). No public notification of a new NVC restructuring plan has been found.
Vigilance Center Deploys Team To Check Compliance With Office Hours
भ्रष्टाचार नियन्त्रणलाई प्रणालीगत बनाउन नेपाल राष्ट्र बैंकले १०० दिनभित्र, बैंक खाता, डिजिटल वालेट, शेयर लगानी तथा अन्य वित्तीय गतिविधिहरूलाई समेट्ने समन्वयात्मक डिजिटल सम्पत्ति लगत (Integrated Digital Asset Registry) स्थापना गर्ने, सोमा जोखिममा आधारित सङ्केत (Risk-Based Red Flag) प्रणाली लागू गर्ने तथा शङ्कास्पद कारोबारहरूको स्वचालित पहिचान गरी सम्बन्धित निकायमार्फत अनुसन्धान प्रक्रिया अघि बढाउने। भ्रष्टाचार विरुद्धको संयुक्त राष्ट्रसङ्घीय अभिसन्धि अनुकूल हुने गरी भ्रष्टाचार विरुद्धको दोस्रो राष्ट्रिय कार्ययोजना १५ दिनभित्र जारी गर्ने। Nepal Rastra Bank will establish an Integrated Digital Asset Registry within 100 days — covering bank accounts, digital wallets, share investments, and other financial activities — with a Risk-Based Red Flag system for automatic identification of suspicious transactions and referral to relevant investigating bodies. Timeline: 100 days Not Started
Show Remarks
Nepal Rastra Bank has existing AML/CFT and financial intelligence frameworks, and a 2026 ordinance expanded the Department of Money Laundering Investigation's powers. The 100-day deadline extends to late June 2026. No NRB press release or gazette notification for this registry has been found. This reform is directly linked to Nepal's FATF grey-list obligations.
भ्रष्टाचार विरुद्धको संयुक्त राष्ट्रसङ्घीय अभिसन्धि अनुकूल हुने गरी भ्रष्टाचार विरुद्धको दोस्रो राष्ट्रिय कार्ययोजना १५ दिनभित्र जारी गर्ने। A Second National Action Plan Against Corruption, aligned with the UN Convention Against Corruption, will be issued within 15 days. Timeline: 15 days Not Started
Show Remarks
The previous government had been working on a second national strategy as recently as December 2025, a Nepali delegation at the 11th UNCAC Conference of States Parties in Doha confirmed that the Second National Strategy and Action Plan Against Corruption was still being "finalized" hinting it had not been completed even after years of drafting. The new government has unveiled a 'National Commitment Document' synthesizing election manifestos from six political parties, with a committment to establish shared ownership among politcal parties.
The Government Has Brought Out A National Commitment Letter Incorporating…
Nepal Reaffirms Zero Tolerance Policy On Corruption At Un Conference
सदाचारिता प्रवद्र्धन, सूचनादाताको संरक्षण (Whistleblower Protection) र हित/स्वार्थको द्वन्द्व (Conflict of Interest) व्यवस्थापनका लागि ३० दिनभित्र राष्ट्रिय सदाचार नीति जारी गर्ने तथा सम्बन्धित कानून तर्जुमा तथा संशोधन प्रक्रिया अघि बढाउने। A National Integrity Policy will be issued within 30 days covering integrity promotion, whistleblower protection, and conflict of interest management, and the related legislation drafting and amendment process will be expedited. Timeline: 30 days Not Started
Show Remarks
The Chief Secretary's statement provides the directive-level intent but is not a formal policy document. Nepal has previously discussed whistleblower protection and conflict-of-interest legislation in the context of CIAA Act reforms, but no standalone National Integrity Policy has been enacted.
Rising Nepal Daily
Public Procurement and Project Management Reform (5 not started)
सार्वजनिक खरिद प्रक्रियामा हुने ढिलासुस्ती, लागत वृद्धि, गुणस्तरहीन कार्य तथा भ्रष्टाचार नियन्त्रण गर्न सार्वजनिक खरिद ऐनलाई ३० दिनभित्र संशोधन गरी Value for Money, Life Cycle Costing, E-Gov Market Place तथा Performance-Based Contracting जस्ता अवधारणाहरू लागू गर्ने। खरिद प्रक्रियालाई पूर्णतः डिजिटल, पारदर्शी तथा ट्र्याकिङयोग्य बनाउने तथा प्रतिस्पर्धालाई प्रोत्साहन गर्ने। The Public Procurement Act will be amended within 30 days — incorporating Value for Money, Life Cycle Costing, E-Gov Marketplace, and Performance-Based Contracting — to control delays, cost overruns, poor quality, and corruption in public procurement. All procurement processes will be made fully digital, transparent, and trackable. Timeline: 30 days Not Started
Show Remarks
The Public Procurement Act (2063 BS) has been amended 14+ times, most recently with the ordinances in 2083 BS. The concepts of Value for Money and Performance-Based Contracting have appeared in PPMO reform discussion documents for years. The 30-day deadline has passed. No new amendment was found in PPMO's published documents. This is a recurring commitment across multiple past government agendas.
Rising Nepal Daily
Now Contracts Will Not Be Awarded Without Ensuring The Site And Budget And A…
आयोजना व्यवस्थापनका लागि देहायका कार्य गर्ने:
क) देशका प्राथमिकता प्राप्त विकास परियोजनाहरूमा स्पष्टता ल्याउन राष्ट्रिय स्तरको Project Pipeline तयार गर्ने, सबै परियोजनाहरूलाई आर्थिक, सामाजिक तथा वातावरणीय आधारमा प्राथमिकता निर्धारण गर्ने तथा प्रत्येक परियोजनाका लागि उपयुक्त लगानी मोडालिटी (सरकारी, PPP, विदेशी लगानी आदि) तय गर्ने कार्य राष्ट्रिय योजना आयोगले दुई महिनाभित्र सम्पन्न गर्ने।
ख) लामो समयदेखि अलपत्र परेका, रुग्ण अवस्थामा रहेका तथा समयमा सम्पन्न हुन नसकेका आयोजनाहरूको पुनरावलोकन गरी बजेट व्यवस्था, जग्गा अधिग्रहण, वातावरणीय प्रभाव मूल्याङ्कन (EIA) स्वीकृति, ठेक्का तोड्ने लगायतका प्रक्रियाहरू सरल बनाउने। रुग्ण आयोजना, ठेक्का तोडिएका परियोजना र प्रतिफलविहीन लगानी भइरहने समस्या समाधान गर्न ३० दिनभित्र अध्ययन टोली गठन गरी उक्त टोलीले आयोजनाको औचित्य र सम्भाव्यता मूल्याङ्कन गरी निरन्तरता दिनुपर्ने वा नपर्ने अवस्थाको बारेमा सिफारिस गर्ने। साथै, कुनै आयोजनाहरूको निर्माण तथा सञ्चालनका लागि अन्तरनिकाय समन्वय गर्नुपर्ने भएमा प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालयले तत्काल समन्वय र सहजीकरण गर्ने।
ग) राष्ट्रिय गौरवका तथा ठूला रणनीतिक आयोजनाहरूको कार्यान्वयनलाई शीघ्र, समयबद्ध तथा गुणस्तरीय बनाउन जग्गा प्राप्ति, मुआब्जा निर्धारण, रुख कटान तथा वातावरणीय प्रभाव मूल्याङ्कन प्रतिवेदन स्वीकृति सम्बन्धी प्रक्रियाहरूलाई “Fast-Track Mechanism” अन्तर्गत सञ्चालन गर्न, सम्बन्धित सबै निकायहरूबीच समन्वय गरी एकीकृत र स्वचालित स्वीकृति प्रणाली लागू गर्न, अनावश्यक ढिलासुस्ती तथा दोहोरो प्रक्रियाहरू हटाउन, स्पष्ट समयसीमा तोकी कार्यान्वयन गर्न तथा आयोजना कार्यान्वयनमा देखिने अवरोधहरू समाधान गर्न प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालयबाट प्रत्यक्ष अनुगमन तथा सहजीकरण गर्ने।
घ) राष्ट्रिय तथा प्राथमिकताप्राप्त पूर्वाधार आयोजनाहरूको कार्यान्वयनमा देखिएको ढिलासुस्ती तथा ठेक्का प्रक्रियामा बारम्बार असफलता अन्त्य गर्न दुई पटकभन्दा बढी ठेक्का नलागेका वा ठेक्का प्रक्रिया असफल भएका आयोजनाहरूलाई सरकारी पूर्वाधार निर्माण कम्पनीमार्फत प्रत्यक्ष कार्यान्वयन गर्ने व्यवस्थाका लागि तीस दिनभित्र कानून तर्जुमा गरी उक्त कम्पनीका लागि आवश्यक पर्ने स्रोत, साधन, जनशक्ति तथा उपकरण व्यवस्थापन गर्ने।
For project management:
a) A national-level Project Pipeline will be prepared within two months by the National Planning Commission — prioritising all projects on economic, social, and environmental grounds, and determining the appropriate investment modality for each.
b) Long-stalled, distressed, and delayed projects will be reviewed to simplify procedures for budget release, land acquisition, EIA approval, and contract termination. A study team will be formed within 30 days to assess viability and make recommendations.
c) For national pride and large strategic projects, a Fast-Track Mechanism will be implemented to expedite land acquisition, compensation, tree-cutting clearances, and EIA approvals — with direct oversight and facilitation by the Office of the Prime Minister and Council of Ministers.
d) For projects that have failed tendering more than twice, legislation will be drafted within 30 days to allow direct execution through a government infrastructure construction company, with the necessary resources, manpower, and equipment allocated.
Not Started
Show Remarks
The FY 2026/27 policies confirm the broad intent of this reform cluster. However, the specific 30-day task force on stalled projects, the 2-month NPC project pipeline with investment modality classification, and the 30-day fast-track legislation have not been individually confirmed as completed. The NPC vice-chairperson post was reportedly vacant during the initial weeks of this government, which may have delayed the pipeline work. This reform has multiple sub-points with different timelines and responsible agencies tracking completion requires sub-point-level verification.
Rising Nepal Daily
आयोजना छनोटदेखि भुक्तानीसम्मका विभिन्न चरणहरूमा ट्र्याकिङ नहुँदा अनियमितता, भेरिएसन आदेशको दुरुपयोग र ढिलाइ हुने समस्या समाधान गर्न ९० दिनभित्र data-based end-to-end e-procurement monitoring प्रणाली लागू गर्ने। A data-based end-to-end e-procurement monitoring system will be implemented within 90 days to track all project stages from selection to payment — preventing irregularities, variation order abuse, and delays. Timeline: 90 days Not Started
Show Remarks
Nepal's Public Procurement Monitoring Office already operates an Electronic Government Procurement (e-GP) portal for tendering. The new reform proposes a "data-based end-to-end monitoring system" covering project selection through payment, with variation-order tracking. This is an enhancement beyond the existing system. The 90-day deadline extends to late June 2026. No public announcement of a new monitoring system has been found
परियोजनाहरू विभिन्न कानून, स्वीकृति र निकायगत प्रक्रियामा अल्झिँदा आयोजना निर्माण तथा सञ्चालनमा वर्षौँ लाग्ने समस्या समाधान गर्न ६० दिनभित्र परियोजना सहजीकरण (Project Facilitation) सम्बन्धी छाता कानूनको मस्यौदा तयार गर्ने। A Project Facilitation Umbrella Law draft will be prepared within 60 days to resolve the problem of projects getting entangled in multiple laws, approvals, and inter-agency processes for years. Not Started
Show Remarks
An umbrella facilitation law cutting across environmental, land acquisition, inter-agency approval, and forest clearance procedures has been discussed for hydropower and infrastructure projects in Nepal for over a decade. It recurs in multiple past government programmes. The 60-day deadline is in late May. No draft bill has been publicly confirmed.
लामो समयदेखि नागरिकलाई दैनिक सास्ती दिइरहेका प्रमुख सडक तथा यातायात पूर्वाधार आयोजना समयमा पूरा नहुने समस्या समाधान गर्न तत्कालै आयोजना निगरानी कार्यतालिका बनाई कार्यान्वयन गर्ने। राजमार्ग (Highway) का रणनीतिक क्षेत्रहरूमा अध्ययन गरेर तौल पुल ४५ दिन भित्र राख्ने। Action monitoring schedules for major road and transport infrastructure projects that have long plagued citizens will be immediately prepared and implemented. Weighbridges will be installed on strategic highway sections within 45 days. TimelineL 45 days Not Started
Show Remarks
Weighbridge installation on Nepal's highways is a recurring commitment. The Department of Roads has intermittently installed weighbridges at some strategic sections (e.g., Narayangadh–Butwal corridor) under past governments. The 45-day deadline (around mid-May 2026) has passed. No dedicated announcement from the Ministry of Physical Infrastructure and Transport on weighbridge installation as part of this 100-point agenda has been found.
Investment, Industry, Private Sector Promotion, and Tourism (3 completed, 3, ongoing, 15 not started)
देशमा व्याप्त लगानी वातावरण सुधार गर्न उद्योग दर्ता, स्वीकृति तथा सञ्चालन प्रक्रियालाई सरल, छिटो तथा पारदर्शी बनाउन उद्योग विभागमा रहेको एकल विन्दु सेवा केन्द्रमा खटिने कर्मचारीलाई थप अधिकार प्रत्यायोजन गरी प्रभावकारी बनाउने। To improve the investment environment, the Single Window Service Centre at the Department of Industry will be made more effective through further delegation of authority to staff dealing with industry registration, approvals, and operational processes. Ongoing
Show Remarks
The Single Window at the Department of Industry (DoI) has existed for years, but staff could previously only provide information, not approve. This reform requires a delegated authority order from the Ministry. No gazette order delegating expanded approval powers to DoI single-window staff has been publicly confirmed. The commitment has no explicit deadline beyond "effective immediately,"
One Stop Service Reform Must Walk Talk
देशको पूर्वाधार विकासलाई द्रुत, व्यवस्थित तथा लगानीमैत्री बनाउन नेपालमा सञ्चालनमा रहेका राष्ट्रिय गौरवका आयोजना तथा लगानी बोर्डमा दर्ता भएका सम्पूर्ण परियोजनाहरूको लगानीको ढाँचा (Investment Modality) अनिवार्य रूपमा निर्धारण गर्ने। सोको लागि राष्ट्रिय योजना आयोग, लगानी बोर्ड नेपाल र अर्थ मन्त्रालयले संयुक्त रूपमा ९० (नब्बे) दिनभित्र सबै परियोजनालाई सरकारी कोष, सार्वजनिक-निजी साझेदारी, निजी लगानी वा मिश्रित लगानी ढाँचामा वर्गीकरण गरी पुँजी परिचालन, जोखिम बाँडफाँट, कार्यान्वयन ढाँचा तथा समयसीमा सहितको National Structured Project Pipeline ९० (नब्बे) दिनभित्र तयार गरी सार्वजनिक गर्ने। उक्त संरचना अनुसार परियोजनाहरूलाई लगानीयोग्य (Bankable) बनाउँदै कार्यान्वयन प्रक्रिया द्रुत रूपमा अघि बढाउने। To make infrastructure development faster, organised, and investment-friendly, the investment modality for all national pride projects and all projects registered with the Investment Board Nepal will be mandatorily determined. The National Planning Commission, Investment Board Nepal, and Ministry of Finance will jointly prepare a National Structured Project Pipeline — classifying all projects under government funding, PPP, private investment, or blended finance — within 90 days. Timeline: 90 days Not Started
Show Remarks
The IBN and CNI PPP pipeline described in May 2026 is a private-sector-prepared list, not the government's formal National Structured Project Pipeline with investment modality classifications for all registered projects. The official pipeline envisioned here which is jointly prepared by NPC, IBN, and Ministry of Finance with PPP/government/private/blended classifications and published risk-allocation structures, has not been formally released. The 90-day deadline extends to late June 2026.
Rising Nepal Daily
स्वदेशी तथा वैदेशिक लगानीकर्ताहरूलाई एकीकृत रूपले सहजताका साथ निर्धारित समयावधि भित्रै तोकिए बमोजिमका सेवा उपलब्ध गराउनका निम्ति लगानी बोर्ड नेपाल अन्तर्गत आगामी एक महिना भित्रै एकद्वार स्वीकृति प्रणाली (One Door Approval System) स्थापना गरी एक महिनाभित्र सञ्चालनमा ल्याउने। A One-Door Approval System will be established under the Investment Board Nepal and operationalised within 30 days to provide domestic and foreign investors with integrated, time-bound services. Timeline: 30 days Not Started
Show Remarks
Cabinet decided on the OSSC on March 27, 2026 (day of government formation). By April 4, IBN had set up a physical investor desk. By May 6, IBN had drafted the Act amendment for the full OSSC. However, the full operationalisation with digital portal, multi-agency coordination, and time-bound services was still in the preparation phase. The 30-day deadline (approximately April 27, 2026) passed without full operationalization.
Khabarhub
Rising Nepal Daily
देशमा उद्यमशीलता प्रवद्र्धन, लगानी वातावरण सुधार तथा व्यवसाय दर्ता प्रक्रियालाई सरल, छिटो (दुई दिन भित्र) र झन्झटरहित बनाउन “Startup Fast Track” प्रणाली लागू गर्ने। A "Startup Fast Track" system will be implemented to make business registration fast (within 2 days), simple, and hassle-free, promoting entrepreneurship and improving the investment climate. Not Started
Show Remarks
The FY 2026/27 policies reference an "Investment Express" policy rather than a "Startup Fast Track" by that name. The timelines differ too: the 100-point agenda pledged 2-day registration; the policies document mentions a 30-day full-process timeline. No specific gazette notification or system launch for a "Startup Fast Track" has been found. This reform connects to Reform 58 (One-Door Business Platform) and may be intended as part of that broader system.
Rising Nepal Daily
साना तथा मझौला उद्योग (SME), कृषि तथा सूचना प्रविधि क्षेत्रको ऋणप्रवाहमा हाल रहेको जोखिम भार (Risk Weightage) घटाई उपयुक्त स्तरमा झार्ने व्यवस्था नेपाल राष्ट्र बैंकले ३० दिनभित्र मिलाउने। Nepal Rastra Bank will reduce the risk weightage applied to lending for SMEs, agriculture, and IT sectors to an appropriate level within 30 days. Timeline: 30 days Not Started
Show Remarks
The new pledge called for a comprehensive reduction specifically for SMEs, agriculture, and IT within 30 days (by late April 2026). No new NRB circular issued specifically under this government's 100-point mandate has been publicly identified. The NRB directive cited in existing sources may be used to claim partial completion, but its issuance was under a prior administration
Nepal Rastra Banks Directive To Reduce The Risk Burden Of Loans Below Rs 30…
वसाय दर्ता, कर दर्ता, बैंक खाता तथा अन्य आवश्यक अनुमति लिनुपर्ने विषयलाई एकीकृत गरी ४५ दिनभित्र One Door Business Platform मार्फत सेवा उपलब्ध गराउने। सेवा प्रवाहको क्रममा सम्पूर्ण प्रक्रिया डिजिटल, पारदर्शी तथा ट्र्याकिङयोग्य बनाई कार्यान्वयनका लागि कानूनी, प्राविधिक तथा प्रक्रियागत सुधार तत्काल लागू गर्ने। A One-Door Business Platform will provide integrated services for business registration, tax registration, bank account opening, and other required permits within 45 days, with all processes digital, transparent, and trackable. Timeline: 45 days Not Started
Show Remarks
Business registration in Nepal currently involves the Company Registrar's Office, the Inland Revenue Department (PAN), and the Department of Industry. A single integrated platform would require interoperability across all three agencies plus NRB (for bank account). The 45-day deadline (mid-May 2026) has passed. No public platform launch has been confirmed. This reform overlaps significantly with Reform 66 (cottage and small industry registration) and Reform 55 (IBN One-Stop Service Centre).
देशमा रोजगारी सिर्जना, सीप विकास तथा उद्यमशीलता प्रवद्र्धनलाई एकीकृत रूपमा सुदृढ गर्न शिक्षा, विज्ञान तथा प्रविधि मन्त्रालय अन्तर्गतको प्राविधिक शिक्षा तथा व्यावसायिक तालिम परिषद् (CTEVT), श्रम, रोजगार तथा सामाजिक सुरक्षा मन्त्रालय अन्तर्गतको व्यावसायिक तथा सीप विकास तालिम प्रतिष्ठान तथा उद्योग, वाणिज्य तथा आपूर्ति मन्त्रालय अन्तर्गतको औद्योगिक व्यवसाय विकास प्रतिष्ठान लगायतका संस्थाहरूले संयुक्त रूपमा कार्य गर्ने गरी रोजगार सेवा केन्द्रहरूलाई ६० दिनभित्र “रोजगार, सीप तथा उद्यमशीलता केन्द्र” का रूपमा रूपान्तरण गर्ने। सो केन्द्रले रोजगारविहीनहरूको दर्ता र सार्वजनिक रोजगार कार्यक्रमका अतिरिक्त स्थानीय सीप तथा सोको माग नक्साङ्कन, तालिम समन्वय, उद्यमशीलता सहजीकरण तथा वैदेशिक रोजगारीबाट फर्किएका श्रमिकहरूको पुनःएकीकरण सम्बन्धी कार्यहरू सञ्चालन गर्ने। स्थानीय तहलाई उक्त केन्द्रको प्रभावकारी परिचालन गर्न न्यूनतम बजेट विनियोजन एवं वार्षिक सीप विकास योजना समावेश गरी कार्यसम्पादनमा जवाफदेहिता सुनिश्चित गर्न अनुरोध गर्ने। उक्त व्यवस्था कार्यान्वयनका लागि आवश्यक डिजिटल प्रणाली, मापदण्ड तथा कार्यविधि तत्काल निर्माण गरी लागू गर्ने। Employment service centres will be transformed into "Employment, Skills, and Entrepreneurship Centres" within 60 days — bringing together CTEVT, the Vocational Skills Development Training Academy, and the Industrial Business Development Institute — to map local skills demand, coordinate training, facilitate entrepreneurship, and reintegrate returning migrant workers. Timeline: 60 days Not Started
Show Remarks
Cabinet approved this reform at the first cabinet meeting on March 27, 2026. The 60-day deadline (approximately late May 2026) has passed. Three agencies under three different ministries are involved (CTEVT under MoEST; Vocational Skills Development Training Academy under MoLESS; Industrial Business Development Institute under MoICS). No public announcement of transformed centres or joint operational framework has been confirmed.
देशको आर्थिक स्थायित्व, लगानी वातावरण सुदृढीकरण तथा निजी क्षेत्रको विश्वास पुन:स्थापना गर्ने उद्देश्यले, “निजी क्षेत्र संरक्षण एवं प्रवद्र्धन रणनीति (Private Sector Protection and Promotion Strategy – PSPP)” स्वीकृत गरी तत्काल कार्यान्वयन गर्ने। सो रणनीति मार्फत भौतिक सुरक्षा तथा सम्पत्ति संरक्षण, आर्थिक पुनरुत्थान तथा नियामकीय सरलीकरण र लगानी प्रवद्र्धन तथा युवा उद्यमशीलता सम्बन्धी कार्यनीतिहरू तत्काल कार्यान्वयन गर्ने। A "Private Sector Protection and Promotion Strategy (PSPP)" will be approved and immediately implemented to restore economic stability, strengthen the investment environment, and rebuild private sector confidence — addressing physical security, asset protection, economic recovery, regulatory simplification, and youth entrepreneurship. Timeline: Immediate Not Started
Show Remarks
The FY 2026/27 policies and programmes (May 12, 2026) reaffirm protection of private sector activity and industrial security as ongoing commitments
Rising Nepal Daily
गृह मन्त्रालयले औद्योगिक तथा व्यावसायिक सुरक्षा सुदृढीकरणका लागि आवश्यक संरचना तथा द्रुत प्रतिकार्य संयन्त्र ३० दिनभित्र विकास गर्ने। The Home Ministry will develop the necessary structures and rapid response mechanism for industrial and commercial security reinforcement within 30 days Timeline: 30 days Not Started
Show Remarks
This mechanism's scope is broader than industrial/commercial security specifically and appears to be a general law-enforcement coordination structure rather than the targeted commercial security reinforcement structure described in the pledge.
Rapid Response Mechanism Formed Across The Country Under The Leadership Of…
सुरक्षा निकायहरूले निजी सम्पत्तिमा भएको क्षति, लुटपाट तथा आक्रमणमा संलग्न व्यक्तिहरूमाथि कडाइका साथ कानूनी कारबाही प्रक्रिया तत्काल अगाडि बढाउने। Security forces will immediately and strictly pursue legal action against those involved in damage, looting, and attacks on private property. Ongoing
अर्थ मन्त्रालय तथा नेपाल राष्ट्र बैंकले जेन-जी जनआन्दोलनका क्रममा प्रभावित व्यवसायहरूका लागि सहुलियत तथा पुनःस्थापना प्याकेज जारी गर्ने। The Ministry of Finance and Nepal Rastra Bank will release a subsidised rehabilitation package for businesses affected during the Gen-Z movement within 100 days. Timeline: 100 days Not Started
Show Remarks
The 100-day deadline for this reform extends to approximately late June 2026. No formal announcement of a targeted package with tax waivers, interest subsidies, or debt restructuring for Gen-Z movement-affected businesses has been publicly confirmed. The broader PSPP strategy (Reform 60) covers some of these themes, but a targeted package for movement-affected businesses is distinct.
देशको लगानी, उत्पादन, निर्यात, उत्पादकत्व तथा विकास वित्त प्रणालीलाई एकीकृत, प्रभावकारी तथा परिणाममुखी बनाउने उद्देश्यले प्रधानमन्त्री तथा मन्त्रिपरिषद्को कार्यालय अन्तर्गत “प्रधानमन्त्री कार्यसम्पादन एकाइ (PM Delivery Unit)” तत्काल स्थापना गर्ने। उक्त एकाइले राष्ट्रिय प्राथमिकता प्राप्त परियोजनाहरूका लागि मुख्य कार्यसम्पादन सूचक (KPI), मन्त्रालयगत कार्यसम्पादन ट्र्याकिङ, समस्या तथा अवरोध समाधान संयन्त्र सहितको केन्द्रीय ड्यासबोर्ड सञ्चालन गर्ने। A "PM Delivery Unit" will be immediately established under the Office of the Prime Minister and Council of Ministers — running a central dashboard with KPIs for national priority projects, ministry-level performance tracking, and a bottleneck resolution mechanism within 30 days. Timeline : 30 days Completed
Show Remarks
The PM Delivery Unit was established under OPMCM and delivery-based governance mechanisms were activated. All ministries submitted their 10-key-action plans to OPMCM. However, a public-facing "central dashboard" tracking KPIs for all national priority projects has not been separately launched at a publicly accessible URL. The OPMCM website hosts ministry-level commitments. Transparency of monitoring remains limited.
लगानी बोर्ड नेपाल, व्यापार तथा निकासी प्रवद्र्धन केन्द्र, उद्योग विभाग लगायतका निकायहरूबीच रहेको कार्यजिम्मेवारीको दोहोरोपन अन्त्य गर्न ३० दिनभित्र एकीकृत संरचनाको विस्तृत सङ्गठन तथा व्यवस्थापन सर्वेक्षणका लागि तत्काल एक कार्यदल गठन गर्ने। उक्त कार्यदलले लगानी प्रवद्र्धन, निर्यात विस्तार तथा प्रवद्र्धन, उद्योग विकास, परियोजना संरचना तथा विकास वित्त सम्बन्धी कार्यहरूलाई एकीकृत रूपमा एकल विन्दु सेवा प्रणालीमा रूपान्तरण गर्न स्पष्ट रोडम्याप, कार्यात्मक संरचना तथा आवश्यक कानूनी व्यवस्था सहितको प्रतिवेदन पेश गर्ने। सो प्रतिवेदनका आधारमा आवश्यक संस्थागत तथा कानूनी सुधार प्रक्रिया तत्काल अगाडि बढाउने। A task force will be immediately formed to address the overlapping mandates of the Investment Board Nepal, the Trade and Export Promotion Centre, and the Department of Industry — and to submit a report within 30 days on an integrated, single-window structure for investment promotion, export expansion, industry development, project structuring, and development finance. Timeline : 30 days Completed
Show Remarks
The task force was formed at the first cabinet meeting. Evidence of its report being submitted and acted upon is visible through IBN's subsequent steps (draft Act amendment, investor desk). However, no publicly released task force report has been found.
नेपालमा उद्योग तथा व्यवसाय सञ्चालनलाई सरल, पारदर्शी र बिचौलिया मुक्त बनाउन, साना उद्योग दर्ता प्रक्रियामा रहेको दोहोरो अभ्यास अन्त्य गरी २५ करोडसम्मका उद्योगहरूलाई एकीकृत रूपमा घरेलु तथा साना उद्योग कार्यालयमार्फत मात्र दर्ता हुने व्यवस्था गर्ने तथा दर्ता शुल्क खारेज गर्ने व्यवस्था ४५ दिनभित्र गर्ने। To simplify industry and business operations, the double registration procedure for small industries will be abolished. Industries with capital up to NPR 25 crore will be registered exclusively through cottage and small industry offices, with registration fees waived. This will be done within 45 days. Timeline: 45 days Not Started
Show Remarks
The existing source (ratopati.com/story/56159) reflects early stakeholder reactions to this pledge from before implementation. The 45-day deadline (approximately mid-May 2026) has passed. No gazette notification waiving registration fees or consolidating the registration process into cottage and small industry offices has been publicly confirmed. Nepal's past registration reform history (including earlier single-window efforts at DoI) suggests that eliminating registration fees requires a Cabinet decision and gazette notification — neither has been publicly found.
Free Registration Of Industries Up To Rs 250 Million Through The Cottage And…
कम्पनी रजिष्ट्रारको कार्यालय, उद्योग विभाग र वाणिज्य आपूर्ति तथा उपभोक्ता संरक्षण विभागमा रहेका उद्योग व्यवसायसँग सम्बन्धित विवरणहरू स्वचालित रूपमा आदान प्रदान (Interoperability) हुने प्रणाली दुई महिना भित्र विकास गर्ने। कम्पनी तथा उद्योग दर्ता र आयात/निर्यात सम्बन्धमा सेवाग्राहीलाई आवश्यक जानकारी तथा सहजीकरण गर्न निःशुल्क परामर्श सेवा डेस्क स्थापना गर्ने, डिजिटल प्रणाली विकास गरी बिचौलियाको संलग्नता अन्त्य गर्ने कार्य १५ दिनभित्र गर्ने। साथै तीनै तहका सरकारी निकायबाट दर्ता भएका उद्योग, व्यवसाय तथा फर्महरूको तथ्याङ्कलाई अद्यावधिक गरी Real Time Data लिने प्रणाली तीन महिना भित्र विकास गर्ने। An interoperability system will be developed within two months for automatic data exchange among the Company Registrar's Office, Department of Industry, and Department of Commerce and Consumer Protection. Free consultancy desks will be set up, and digital systems will eliminate the role of intermediaries within 15 days. A real-time data system for all three tiers of government-registered industries, businesses, and firms will be developed within three months. Not Started
औद्योगिक प्रतिष्ठानहरूको Corporate Social Responsibility (CSR) रकमलाई केन्द्रीकृत गरी नेपाल सरकारले तोकेको कोषमार्फत प्राथमिकताका क्षेत्रमा परिचालन गर्ने व्यवस्था मिलाउने तथा यसका लागि आवश्यक कानून संशोधन तथा निर्माण गर्ने कार्य तीन महिनाभित्र सम्पन्न गर्ने। CSR funds from industrial establishments will be channelled through a centralised government-designated fund into priority areas. Necessary legislation will be completed within three months. Timeline: 3 months Not Started
जेन-जी आन्दोलन तथा सार्वजनिक प्रदर्शनका कारण निजी क्षेत्रको लगानी वातावरण र रोजगारीमा परेको प्रभावलाई न्यूनीकरण गर्दै सुरक्षित, स्थिर र विश्वसनीय व्यावसायिक वातावरण सुनिश्चित गर्ने उद्देश्यले, देहाय बमोजिम गर्ने-
क) निजी क्षेत्र, उद्योग-व्यवसाय, बैंक तथा वित्तीय संस्था, साना तथा मझौला उद्यम (SMEs) तथा सेवा क्षेत्रको सुरक्षा तथा संरक्षणका लागि “Private Sector Protection Strategy” बनाई तत्काल लागू गर्ने।
ख) उद्योग, व्यापारिक केन्द्र, बैंकिङ पूर्वाधार तथा आपूर्ति शृङ्खलाको सुरक्षाका लागि सुरक्षा निकायलाई उच्च सतर्कता कायम गर्न तथा विशेष सुरक्षा प्रबन्ध गर्ने।
ग) प्रदर्शनका कारण अवरोध भएका व्यवसाय सञ्चालन तथा पुनःसञ्चालनको लागि प्राथमिकताका साथ प्रशासनिक सहजीकरण गर्ने।
घ) व्यवसायमा भएको क्षतिको तथ्याङ्क सङ्कलन गरी आवश्यक राहत, पुन:स्थापना तथा सहुलियत प्याकेज (जस्तै: कर छुट, ब्याज सहुलियत, ऋण पुनसंरचना) तयार गर्ने।
ङ) निजी क्षेत्रसँग निरन्तर संवाद तथा समन्वयका लागि प्रधानमन्त्रीको अध्यक्षतामा रहेको उद्योग-वाणिज्य सम्वाद परिषद्लाई सक्रिय गराउने।
To minimize the impact of the Gen-Z movement on the investment climate and employment, and ensure a safe, stable, and reliable business environment, the following will be done:
a) A "Private Sector Protection Strategy" will be formulated and immediately implemented.
b) Security forces will maintain high alert to protect industry, business centres, banking infrastructure, and supply chains.
c) Administrative facilitation will be prioritised for businesses disrupted during protests.
d) Loss data will be collected and relief/rehabilitation packages prepared (tax waivers, interest subsidies, debt restructuring).
e)The Industry-Commerce Dialogue Council chaired by the Prime Minister will be activated for ongoing communication with the private sector
Ongoing
Show Remarks
Several parts of this pledge have moved forward, but not all sub‑points are fully verifiable or clearly implemented in the exact form promised. The new government has approved and started implementing a “Private Sector Protection and Promotion Strategy (PSPP)”, endorsed at the first cabinet meeting and listed as point 60 of the 100‑point governance reform agenda.Business bodies and media repeatedly call on government to activate or use a Prime‑Minister‑led Industry–Commerce Dialogue Council as a standing forum with the private sector; this is mentioned as a recommendation in coverage of the government’s reform push.However, available sources talk about broader dialogue with the private sector (FNCCI conferences, conclaves, consultations, and the new 100‑point reform agenda process) rather than confirming that this specific council, chaired by the PM under that exact name, has been formally activated and is meeting regularly.
Fncci Welcomes Government Decision To Implement Private Sector Protection…
Private Sector Welcomes Governments Reform Push
आपूर्ति शृङ्खलामा अवरोध हुन नदिन आयात निर्यात हुने मार्गमा ढुवानीका साधन विना अवरोध सञ्चालन हुने व्यवस्था गृह मन्त्रालयले तत्काल मिलाउने। The Home Ministry will immediately ensure unobstructed movement of transport vehicles used for import/export to prevent supply chain disruptions. Not Started
Show Remarks
No publicly visible, formal Home Ministry directive or standard operating procedure that reliably guarantees unobstructed movement for all import/export vehicles.
वैदेशिक तथा आन्तरिक लगानी प्रवद्र्धन गर्न स्वच्छ लगानी वातावरण सुनिश्चित गर्ने, स्वचालित लगानी स्वीकृति प्रणाली लागू गर्ने, लगानीकर्ताको वास्तविक स्वामित्व (Beneficial Ownership) खुलाउने व्यवस्थालाई कडाइका साथ कार्यान्वयन गर्ने र अन्तर्राष्ट्रिय कर तथा वित्तीय पारदर्शिता मापदण्ड (Base Erosion and Profit Shifting – BEPS) लागू गरी पुँजी पलायन तथा मनी लाउन्डरिंग नियन्त्रण गर्ने। To promote foreign and domestic investment: a clean investment environment will be maintained, an automatic investment approval system will be implemented, beneficial ownership disclosure will be strictly enforced, and Base Erosion and Profit Shifting (BEPS) standards will be applied to control capital flight and money laundering. Not Started
Show Remarks
Improving but not yet fully realised by the current government. Clean investment environment is improving but not fully credible yet due to enforcement gaps and FATF grey‑list status. In early 2026, the government removed the upper investment ceiling for FDI under the automatic route (previously capped at NPR 500 million), allowing large‑scale investments to come in without prior case‑by‑case approval in designated sectors. FATF‑related reporting in March 2026 notes that Nepal remains on the FATF grey list, and progress on the agreed two‑year action plan has been slower than required; key sectoral risk‑assessment reports were still incomplete by late 2025, and major results on investigations, prosecutions and asset recovery are expected only in the October 2026–February 2027 window. No clear, separate BEPS‑branded policy package or tax‑base‑erosion–specific regime has been rolled out in this period; reforms remain framed mainly as AML/FATF alignment.
Nepal Lifts Cap On Automatic Route Fdi Signaling A Major Shift In Investment…
Instead Of Exiting Fatfs Grey List Nepal Faces Risk Of Falling Into Dark…
उदयपुर (कोशी नदी आसपास), अछाम (रामारोशन), बाजुरा बडिमालिका, अपी हिमाल ट्रेकिङ रुट, दोर्दी हिमाल ट्रेकिङ रुट लगायतका क्षेत्रमा व्यवस्थित पर्यटनका लागि आवश्यक अध्ययन गरी १ महिनाभित्र कार्यान्वयनयोग्य खाका प्रस्तुत गर्ने। Necessary studies for organised tourism in areas including Udayapur (Koshi River), Achham (Ramaroshan), Bajura (Badimalika), the Api Himal Trekking Route, and Dodi Himal Trekking Route will be conducted, and an actionable plan will be presented within one month. Timeline: 1 month Not Started
Show Remarks
Available information shows that this government has declared the required feasibility studies and announced them as part of its 100‑day tourism push, but there is no public evidence yet that all studies are completed and that a consolidated actionable plan for these specific sites has been presented within the one‑month timeline. There are pre‑existing masterplans or provincial initiatives for some areas (e.g., Badimalika masterplan in Bajura; earlier province‑level tourism work around Koshi), but these predate this government and do not count as completion of the new, specifically mandated “one‑month” studies and plan.
Tourism Mail
नेपाललाई आरोग्य पर्यटन (पूर्वीय दर्शन, ध्यान, योग, प्राकृतिक चिकित्सा लगायत) को हब बनाउन १५ दिनभित्र आरोग्य पर्यटन रणनीति जारी गर्ने। साथै, नेपालको प्रस्तावमा संयुक्त राष्ट्रसङ्घले अप्रिल १५ लाई अन्तर्राष्ट्रिय आरोग्य दिवस मनाउने निर्णय गरेकोमा उक्त प्रस्तावमा मतदान गर्ने सबै सदस्य राष्ट्रहरूलाई धन्यवाद ज्ञापन गर्ने। आरोग्य पर्यटनलाई आर्थिक रूपान्तरणको राष्ट्रिय एजेन्डाको रूपमा लिई “Nepal Wellness Year 2027” मनाउन अन्तरनिकाय समन्वय संयन्त्र बनाउने। A Wellness Tourism Strategy will be issued within 15 days to make Nepal a hub for wellness tourism (Eastern philosophy, meditation, yoga, naturopathic medicine). Nepal will also celebrate "Nepal Wellness Year 2027." Timeline: 15 days Completed
Show Remarks
On 15 April 2026, at a national event in Tundikhel marking International Wellness Day, the government and Nepal Tourism Board officially launched the Wellness Tourism Strategy, framing it as the guiding framework to develop Nepal as a premier global wellness destination.
Nepal Unveils Wellness Tourism Vision Announces Nepal Wellness Year 2027
Energy and Water Resources (3 ongoing, 1 not started)
ऊर्जा क्षेत्र विकासका लागि देहायका कार्य गर्ने:
क) ऊर्जा निर्यात रणनीति एक महिनाभित्र तयार गर्ने।
ख) देशको ऊर्जा क्षेत्रलाई आर्थिक रूपान्तरणको प्रमुख आधारका रूपमा विकास गर्न, विद्युत् उत्पादन, प्रसारण, वितरण तथा निर्यात सम्बन्धी अवरोधहरू तत्काल हटाई द्रुत विकास सुनिश्चित गर्ने उद्देश्यले पेन्डिङ रहेका सबै विद्युत् खरिद सम्झौता (PPA) तथा अनुमतिपत्र सम्बन्धी निर्णय अधिकतम १८० दिनभित्र गर्ने।
ग) विद्युत् निर्यातलाई उच्च मूल्य प्राप्त हुने बजार (विशेष गरी साँझको पीक समय) मा केन्द्रित गर्ने रणनीति तत्कालै कार्यान्वयनमा लैजाने।
घ) नेपाल विद्युत् प्राधिकरणको संरचनात्मक सुधार सम्बन्धी रोडम्याप तयार गरी कार्यान्वयन प्रक्रिया तत्काल अघि बढाउने।
ङ) ऊर्जा क्षेत्रको दीर्घकालीन वित्तीय स्रोत व्यवस्थापनका लागि बहुआयामिक वित्तीय संरचना (सरकारी, निजी, विदेशी तथा डायस्पोरा लगानी) विकास गर्ने। साथै, उक्त सुधारहरू कार्यान्वयनका लागि सम्बन्धित निकायले स्पष्ट समयसीमा तोकी कार्यान्वयनमा लैजाने।
For energy sector development:
a) For energy sector development:
b) All pending Power Purchase Agreements (PPAs) and license decisions will be resolved within a maximum of 180 days
c) A strategy focusing exports on high-value markets — especially evening peak hours — will be immediately implemented.
d) A structural reform roadmap for the Nepal Electricity Authority will be prepared and implementation expedited
e) A multi-dimensional financial structure (government, private, foreign, and diaspora investment) will be developed for long-term energy sector financing.
Ongoing
Show Remarks
Intent articulated and some building blocks (carbon unit, longer licences, export revenue focus) are being introduced, but a comprehensive multi‑source financing framework is not yet formally in place.b) PPAs and licenses within 180 days – Decision taken; implementation in progress within the 180‑day window (result not yet verifiable).

c) High‑value/peak‑hour export strategy – Achieved at strategy level; early implementation.

d) NEA structural reform roadmap – Partially achieved (ministerial 32‑point directive; full roadmap still to be formalised).

e) Multi‑dimensional financial structure – Initiated (elements in new strategy and directives) but not yet a clearly defined, unified structure.

Rising Nepal Daily
Energy Consumption Growth And Export Strategy 2083 Submitted To Minister…
Rising Nepal Daily
Nepal Energy Crossroads Brewing Aspirations Powering Future
खानेपानी तथा सरसफाइ क्षेत्रका विभिन्न निकायबीच समन्वयको अभाव अन्त्य गर्न प्रधानमन्त्री तथा मन्त्रिपरिषद् कार्यालयको नेतृत्वमा काठमाडौँ उपत्यका खानेपानी लिमिटेड, नेपाल खानेपानी संस्थान र खानेपानी तथा ढल व्यवस्थापन विभाग समावेश गरी एकीकृत संयन्त्र तयार गर्न एक उच्चस्तरीय “एकीकृत खानेपानी समन्वय टास्कफोर्स” गठन गर्ने। यसले ३० दिनभित्र एकीकृत संरचना र सुधार प्रस्ताव पेश गर्ने। A high-level "Integrated Water Supply Coordination Task Force" — comprising KUKL, Nepal Water Supply Corporation, and the Department of Water Supply and Sewerage Management — will be formed under the leadership of the Office of the Prime Minister and Council of Ministers. It will present an integrated structure and reform proposal within 30 days. Timeline: 30 days Not Started
Show Remarks
There is no public evidence yet that this specific high‑level “Integrated Water Supply Coordination Task Force” has actually been formed or that it has submitted an integrated structure and reform proposal within 30 days; the commitment appears on the roadmap as pending. No press release, gazette notice, or media report could be found that describes a submitted integrated structure and reform proposal from such a task force covering KUKL, NWSC and the Department of Water Supply and Sewerage Management.
पोखरास्थित फेवा संरक्षित जलाधार क्षेत्रको अतिक्रमण हटाई पुनःस्थापना, पहिरो व्यवस्थापन, मुहान संरक्षण र जलवायु परिवर्तन अनुकूलनका कार्यहरू सरोकारवालाहरूको सहभागितामा तीन महिना भित्र प्रक्रिया अघि बढाई जलाधार क्षेत्रको प्रभावकारी रूपमा संरक्षण गर्ने। Encroachments in the Fewa Lake protected watershed area in Pokhara will be removed, and works on slope stabilisation, spring conservation, and climate change adaptation will be advanced within three months with stakeholder participation. Ongoing
Show Remarks
Encroachment removal in Phewa protected watershed: Initiated and ongoing (demolitions started; full clearance will take years and large compensation budgets). Slope stabilisation, spring conservation, climate‑adaptation works: Concepts and preparatory steps discussed; no evidence of comprehensive implementation within three months.Stakeholder participation is occuring through facilitation committee and multi‑tier coordination, but with significant political, financial and social challenges.
Protection Of The Fewa Lake Watershed Intensified
Rising Nepal Daily
शहरी विकास विधेयक र फोहोरमैला व्यवस्था सम्बन्धी विधेयक सङ्घीय संसद्मा पेश गर्ने स्वीकृतिका लागि दुई महिनाभित्र मन्त्रिपरिषद् समक्ष पेश गर्ने। The Urban Development Bill and the Solid Waste Management Bill will be presented to the Council of Ministers within two months for approval before tabling in Parliament. Ongoing
Show Remarks
Ministry of Urban Development is reported to have “accelerated work” on the Urban Development Bill, but no explicit report of cabinet approval or parliamentary tabling yet. Solid‑waste reforms are highlighted in policy speeches, and local‑level bills are being validated, but no clear sign that a new national Solid Waste Management Bill has been approved by the Council of Ministers within the deadline.
Government Moves To Revamp Decades Old Laws To Unlock Investment Climate
Revenue Reform (3 completed, 1 ongoing, 3 not started)
राज्यका निष्क्रिय स्रोतहरूको प्रभावकारी उपयोग गर्न १० वर्ष वा सोभन्दा बढी समयदेखि निष्क्रिय रहेका बैंक तथा वित्तीय संस्थाका खाताहरूको विवरण सङ्कलन गरी हकवालाले दावी नगरेको रकम कानूनी प्रक्रिया पूरा गरी राज्यकोषमा ल्याउने तथा अन्य स्रोतहरूको पहिचान गरी व्यवस्थापन गर्ने कार्य ९० दिनभित्र सम्पन्न गर्ने। Inactive bank accounts dormant for 10 or more years will be identified and, where no claim has been made by the rightful owner, the funds will be transferred to the state treasury following due legal process, within 90 days. Timeline: 90 days Not Started
Show Remarks
Identification and public communication started, but existing law sends 20‑year unclaimed deposits to NRB’s Banking Development Fund, not treasury, and cannot be overridden without legal amendment. No evidence of actual transfers to state treasury within 90 days.
Can The Government Take Money From Bank Accounts That Have Been Inactive For…
Clickmandu
राजस्व प्रणालीलाई पारदर्शी, डिजिटल तथा प्रभावी बनाउन ठूला व्यवसायहरूले अनिवार्य रूपमा e-billing प्रणाली एक महिनाभित्र लागू गर्ने। Large businesses will be required to implement a mandatory e-billing system within one month to make the revenue system transparent, digital, and effective Timeline: 1 month Completed
Show Remarks
Mandatory e‑billing for large taxpayers was already in place; in April 2026 IRD lowered the threshold from NPR 250m to NPR 200m annual turnover, expanding coverage.
Govt Reduces Threshold Of Mandatory E Billing To Rs 200 Million From Rs 250…
कर प्रशासनलाई स्वचालित बनाउने, राजस्व चुहावट नियन्त्रण गर्ने तथा करदातालाई सरल सेवा उपलब्ध गराउने कार्ययोजना अर्थ मन्त्रालयले ४५ दिनभित्र तर्जुमा गरी लागू गर्ने। The Ministry of Finance will prepare and implement a plan within 45 days to automate tax administration, control revenue leakage, and provide simplified services to taxpayers. Timeline: 45 days Completed
Show Remarks
Broader policy and programme documents for FY 2083/84 (2026/27) talk about making revenue administration technology‑friendly, promoting a formal, cashless economy, and reforming tax structures, but they do not point to a specific 45‑day plan having been prepared and rolled out.
Rising Nepal Daily
करिब १३९ भन्दा बढी कोषहरू छरिएर, दोहोरिएर वा कम प्रभावकारी रूपमा सञ्चालन हुँदा सार्वजनिक स्रोतको उपयोग कमजोर भएको समस्या समाधान गर्न ६० दिनभित्र समान प्रकृतिका कोषहरूको एकीकरण तथा रकम उच्च प्रतिफलयुक्त परियोजनामा लगानी गर्ने ढाँचा तयार गर्ने। Over 139 government funds currently operating in a fragmented, duplicated, or ineffective manner will be consolidated — with similar-natured funds merged and capital redirected to high-yield projects — within 60 days. Timeline: 60 days Not Started
Show Remarks
The Ministry of Finance and Fiscal Comptroller General’s Office have already been mapping “extra‑budgetary” and scattered funds for several years; a 2025 report admits they still do not have consolidated details of all such funds and that mapping is only preliminary. There is no public record of actual mergers and capital reallocation within the 60‑day window. Consolidation remains at framework‑design and data‑gathering stage.
खानी तथा खनिज क्षेत्रका निष्क्रिय अनुमतिपत्र खारेज गर्ने तथा सक्रिय फर्महरूको कडाइका साथ नियमन गर्ने। खानी तथा खनिज पदार्थ ऐन, २०४२, सम्बन्धित नियमावली तथा कार्यविधिहरूलाई समयानुकूल संशोधन तथा परिमार्जन गरी लगानीमैत्री, पारदर्शी तथा कार्यान्वयनयोग्य बनाई विभाग अन्तर्गतका प्रयोगशालाहरूमा आधुनिक उपकरण (XRF, XRD, ICP-MS, Petrographic Microscope आदि) जडान गरी परीक्षण क्षमता अभिवृद्धि गर्ने कार्य तीन महिनामा प्रारम्भ गर्ने। साथै, रणनीतिक खनिजहरूको एकीकृत डाटाबेस निर्माण गर्ने। Inactive mining and mineral licences will be cancelled and active firms strictly regulated. The Mines and Minerals Act, 2042, and related regulations and working procedures will be updated to be investment-friendly, transparent, and enforceable. Laboratory equipment (XRF, XRD, ICP-MS, Petrographic Microscope) will be installed to enhance testing capacity within three months. An integrated database of strategic minerals will also be created. Ongoing
Show Remarks
Reports state that amendments are in progress for the Mines and Minerals Act, 2042 BS. Intent is declared but no public draft or amendment passed yet. Reports state that a senior official at the ministry announced plans to install modern equipment in laboratories under the Department of Mines within three months to enhance testing capacity. Integrated database of strategic minerals was announced, yet no visible launch of a new integrated database beyond existing DMG information systems
Government Moves To Revamp Decades Old Laws To Unlock Investment Climate
En
भन्सार प्रणालीलाई व्यापार सहजीकरणमुखी रूपमा पुनर्संरचना गर्ने, वाणिज्य तथा उपभोक्ता संरक्षण सम्बन्धी कार्यहरूलाई अलग गरी प्रभावकारी नियमन सुनिश्चित गर्ने तथा बजारमा Maximum Retail Price (MRP) अनिवार्य कार्यान्वयन र सघन अनुगमन गर्ने। The customs system will be restructured to be trade-facilitation-focused, commercial and consumer protection functions will be separated for effective regulation, and Maximum Retail Price (MRP) enforcement and monitoring will be mandatory in the market. Completed
Show Remarks
In April 2026, the government issued a notice making it mandatory from 28 April 2026 for all imported finished goods to carry an MRP label before customs clearance, and extending MRP labelling requirements to all domestically produced goods as well. This triggered strong pushback from the private sector, which warned about supply disruptions and asked for more study and consultation; more than 60 containers were halted at Biratnagar Customs as strict enforcement of the new labelling rule began. In May 2026, the government brought into force new Customs Regulations 2083, repealing 17 older regulations and explicitly aligning with global trade‑facilitation principles, legal recognition of electronic systems, and “respect for honest traders,” which strengthens the trade‑facilitation focus of customs.
Government Moves To Revamp Decades Old Laws To Unlock Investment Climate
Private Sector Opposes Mandatory Mrp Provision
अड्डा अदालत तथा सरकारी निकायमा रहेको ठूलो धरौटी रकम निष्क्रिय भई विकास निर्माणमा उपयोग हुन नसकेको समस्या समाधान गर्न ६० दिनभित्र त्यस्तो रकम परिचालन गर्ने कानूनी आधार तयार गर्ने। A legal basis for utilising large dormant deposit amounts held in courts and government offices — which currently cannot be used for development — will be prepared within 60 days. Timeline: 60 days Not Started
Show Remarks
Prior to the new government, the Financial Comptroller General’s Office had already mapped many extra‑budgetary funds and draft procedures to systematise and manage them were sent to the Ministry of Finance for approval, but these relate mainly to scattered government funds, not yet to a new legal basis for using court/government deposits.
Cash Continues To Pile Up In Government Funds No Proper Accounting
Health, Education, and Human Development (3 completed, 2 ongoing)
स्वास्थ्य क्षेत्रको सुधारका लागि देहायका कार्य गर्ने:
क) विपन्न, असहाय तथा वेवारिसे बिरामीले अस्पताल सेवामा पहुँच नपाउने, आर्थिक कारणले उपचारबाट वञ्चित अवस्थाको अन्त्य गर्न र निजी-सरकारी दुवै क्षेत्रमा सामाजिक उत्तरदायित्व अभिवृद्धि गर्न सरकारी तथा निजी अस्पतालका कुल शय्यामध्ये कम्तीमा १० प्रतिशत निःशुल्क उपलब्ध गराउने व्यवस्था कडाइका साथ तत्काल कार्यान्वयन गर्ने। सम्पूर्ण स्वास्थ्य संस्थाहरूमा निःशुल्क सेवा उपलब्धता, लाभार्थी विवरण तथा सेवा उपयोगको रियल टाइम अनुगमनका लागि “Free Health Portal” विकास गरी उक्त पोर्टल ३० दिनभित्र देशभर लागू गर्ने।
ख) बिरामीको उपचार इतिहास, Referral, पुनःसेवा र Clinical Follow-Up व्यवस्थित गर्न बिरामीको अभिलेख प्रणाली (Patient Record System) का लागि डिजिटल, एकीकृत र अन्तर-आबद्ध स्वास्थ्य सूचना प्रणाली विकास तीन महिनाभित्र गर्ने। अनावश्यक निजी अस्पताल रेफर गर्ने प्रवृत्ति नियन्त्रण गर्न स्पष्ट Refer Protocol लागू गर्ने।
ग) सरकारी अस्पतालमा स्वास्थ्यकर्मीको उपस्थिति, व्यवहार, सरसफाइ र सेवाको आधारभूत मापदण्ड सुनिश्चित गर्न Attendance Monitoring, Conduct Review र Cleanliness Audit एक हप्ताभित्र अनिवार्य गर्ने तथा सम्पूर्ण सेवा प्रवाहलाई नागरिकमैत्री र जवाफदेही बनाउने।
घ) अस्पताल फार्मेसीमा औषधीको मौज्दात तथा मूल्य देखिने डिजिटल प्रणाली तीन महिनाभित्र सञ्चालन गर्ने। नागरिकलाई गुणस्तरीय तथा सस्तो मूल्यमा औषधी उपलब्ध गराउने उद्देश्यले, देशभरका सरकारी अस्पताल तथा प्रमुख स्वास्थ्य संस्थाहरूमा “सुलभ फार्मेसी” सञ्चालन गर्ने व्यवस्था लागू गर्ने, उक्त फार्मेसीमार्फत आवश्यक औषधीहरू जेनेरिक नाममा न्यूनतम मूल्यमा उपलब्ध गराउने, निजी क्षेत्रसँग सहकार्य गरी आपूर्ति व्यवस्थापन सुदृढ गर्ने र उक्त कार्यक्रम १०० (एक सय) दिनभित्र चरणबद्ध रूपमा देशभर सञ्चालनमा ल्याउने।
ङ) जलन उपचारका लागि प्रदेशस्तरमा सुविधासम्पन्न अस्पतालको अभाव हुँदा मृत्युदर, अपाङ्गता र दीर्घकालीन पुन:स्थापना समस्या बढ्ने अवस्थाको समाधान गर्न ३० दिनभित्र अधिकांश अस्पतालहरूमा Burn Ward स्थापना प्रक्रिया सुरु गर्ने। जलनका बिरामीका लागि सहुलियत दरमा उपचार हुने व्यवस्था मिलाउने।
च) सुदूरपश्चिम, मध्य तथा पूर्वी नेपालका पहाडी क्षेत्रहरूमा आपत्कालीन स्वास्थ्य सेवाका लागि एयर एम्बुलेन्स तयारी अवस्थामा (standby) राख्ने व्यवस्था तत्काल लागू गर्ने।
For health sector reforms:
a) At least 10% of total beds in both public and private hospitals will immediately be made available free of charge, with a "Free Health Portal" developed and rolled out nationwide within 30 days for real-time monitoring.
b) A digital, integrated, and interlinked Patient Record System covering treatment history, referrals, re-care, and clinical follow-up will be developed within three months. A clear Referral Protocol will be enforced to prevent unnecessary referrals to private hospitals.
c) Attendance monitoring, conduct review, and cleanliness audits at government hospitals will be made mandatory within one week to ensure basic standards of healthcare worker attendance, behaviour, cleanliness, and service quality.
d) A digital system showing medicine inventory and prices at hospital pharmacies will be operational within three months. Affordable pharmacies (Sulabha Pharmacy) offering essential medicines at minimum generic prices will be rolled out nationwide in phases within 100 days.
e) Burn ward establishment processes will be initiated in most hospitals within 30 days at the provincial level, with subsidised treatment for burn patients.
f) Air ambulances will be maintained on standby for emergency health services in remote hilly areas of Far-Western, Mid-Western, and Eastern Nepal — effective immediately.
Ongoing
Show Remarks
For sub‑point (a), 10 percent free beds and the Free Health Portal are achieved and now scaling up, with a legal order issued, the Free Health Portal/dashboard live, and dozens of hospitals already reporting 10 percent free beds online.

For sub‑point (b), the digital Patient Record System and referral protocol are initiated but not achieved, as the plan and intent are clear but there is still no fully deployed nationwide electronic health‑record system or enforced referral protocol.

For sub‑point (c), attendance and cleanliness audits are partially achieved, since monitoring and inspections have started at major hospitals, but there is no evidence yet of a structured, universal one‑week rollout across all government hospitals.

For sub‑point (d), the digital pharmacy system and Sulabha Pharmacies are initiated but only partially implemented, with drug MRPs set nationally and the Sulabha Pharmacy concept announced, but no documented nationwide digital inventory/price dashboards or full rollout.

For sub‑point (e), burn wards and subsidised treatment are treated as achieved in intent and launch, because burn wards are being established at key provincial hospitals, burn services have been revived, and subsidies are emphasised, even though “most hospitals” have not yet been reached.

For the air‑ambulance commitment, air ambulances on standby are treated as achieved at launch, with standby arrangements and rescue procedures now in motion for hilly regions of the Far‑West and East, although full rollout is still consolidating

Government Launches Free Health Portal To Ensure Transparency In Nepals…
Ministry Asks Private Hospitals To Provide 10 Percent Of Beds Free Of Charge
Health Minister Mehta Launches Cleanliness Campaign At Bir Hospital Photo…
Health Ministry Rolls Out Free Treatment Listings Burn Wards And Air…
शिक्षा क्षेत्रमा दलीय हस्तक्षेप, विद्यार्थीको वास्तविक आवाज नसमेटिने र शैक्षिक गुणस्तर गिरावटको समस्या समाधान गर्न ६० दिनभित्र विद्यालय/विश्वविद्यालय हाताबाट दलीय विद्यार्थी सङ्गठनका संरचना हटाई ९० दिनभित्र Student Council/ Voice of Student संयन्त्रको विकास गर्ने। To address party interference in education, the absence of genuine student voice, and declining academic standards, party-based student organisation structures will be removed from school/university campuses within 60 days, and a Student Council / Voice of Student mechanism will be developed within 90 days Timeline: 60-90 days Ongoing
Show Remarks
Initiated but not achieved (directive and legal process in place; implementation contested and incomplete. The government has ordered party‑affiliated student organisations to be removed from schools and universities within 60 days and has begun enforcement via UGC decisions and planned security deployment, but partisan structures and activities are still present on many campuses, so the 60‑day removal target is not yet fully met.
Sc Halts Decision To Dissolve Student Organisations
Post
विश्वविद्यालयहरूबाट लिइने स्नातक र स्नातकोत्तर परीक्षाको नतिजा शिक्षा, विज्ञान तथा प्रविधि मन्त्रालयले उपलब्ध गराएको क्यालेन्डर अनुसार निकाल्ने। Results of undergraduate and postgraduate examinations from universities will be published according to a calendar provided by the Ministry of Education, Science, and Technology. Completed
Show Remarks
The government has committed to and begun introducing a MoEST‑driven academic calendar and has directed universities to align exam schedules and result publication with it.
Signs Of Improvement At Tribhuvan University Academic Calendar To Be…
विद्यार्थीहरूलाई स्नातक सम्मको अध्ययन गर्न नागरिकता नचाहिने गरी विश्वविद्यालयहरूले आवश्यक कार्यविधिगत व्यवस्था तत्कालै गर्ने। Universities will immediately put in place the necessary procedural arrangements so that students up to the bachelor's level do not need to provide citizenship certificates for enrolment. Completed
Show Remarks
The government has instructed universities to immediately update admission procedures so that students up to the bachelor’s level no longer need to provide citizenship certificates, but this remains in the directive and transition phase, and there is no clear evidence yet that all universities have fully removed the citizenship requirement in actual enrolment practice.
No Citizenship Needed To Study Up To Bachelors
कक्षा ५ सम्मका विद्यार्थीहरूलाई आन्तरिक परीक्षा लिने कार्य आगामी शैक्षिक सत्रदेखि बन्द गर्ने। उनीहरूलाई मनोवैज्ञानिक असर र दबाब नपर्ने खालको मूल्याङ्कन प्रणालीबारे विकल्प तयार गर्ने। Internal examinations for students up to Class 5 will be discontinued from the next academic year. Alternative assessment methods that do not create psychological pressure on young children will be developed Completed
Show Remarks
The government has decided to abolish internal examinations for students up to Grade 5 from the next academic year and is exploring alternatives such as continuous, classroom‑based assessment to reduce psychological pressure, but the detailed alternative assessment system is still being designed and not yet fully implemented.
Government Announces Suspension Of Internal Exams For Students Up To Grade 5
Primary Level Freed From Exams Cas Could Be An Alternative
Agriculture, Land, Infrastructure, and Basic Services (2 ongoing, 1 not started)
कृषि क्षेत्रको विकासका लागि देहायका कार्य गर्ने:
क) प्रमुख कृषि उपजको न्यूनतम मूल्य सुरक्षा नहुँदा किसान बजारको अनियन्त्रित उतारचढावबाट घाटामा जाने समस्या समाधान गर्न ३० दिनभित्र प्रमुख खाद्यान्न वालीको न्यूनतम समर्थन मूल्य निर्धारण प्रक्रिया सुरु गर्ने।
ख) कृषकले उत्पादन गरेको कृषि उपजको उचित मूल्य सुनिश्चित गर्न कृषि उपज खरिदमा उधारो कारोबार अधिकतम २५ दिनभित्र अनिवार्य भुक्तानी हुने व्यवस्था लागू गर्ने र सो अवधिभित्र भुक्तानी नभएमा ब्याजसहित भुक्तानी गर्नुपर्ने निर्देशिका तत्काल जारी गर्ने, कृषि उपजको बजार पहुँच सुदृढ गर्न राष्ट्रिय कृषि बजार सूचना प्रणाली सञ्चालन गर्ने तथा एसएमएस/डिजिटल माध्यमबाट दैनिक मूल्य जानकारी कृषकसम्म पुर्‍याउने, प्रत्येक पालिकामा साप्ताहिक कृषि हाटबजार सञ्चालन गर्न स्थानीय तहलाई सहजीकरण गर्ने, कृषि उपजको भण्डारण तथा बजारीकरण सुधारका लागि “एक पालिका एक चिस्यान केन्द्र” कार्यक्रम प्रारम्भ गर्ने। प्रत्येक जिल्लामा सार्वजनिक निजी साझेदारीमा चिस्यान केन्द्र स्थापना गर्न १० दिनभित्र सम्भाव्यता अध्ययन गर्ने।
ग) व्यावसायिक कृषि फार्म सञ्चालन गरेका कृषकहरूलाई स्वाइल हेल्थ कार्ड (Soil Health Card) दिने व्यवस्था तीन महिनाभित्र सम्पन्न गर्ने।
For agricultural sector development:
a) A minimum support price determination process for major food crops will begin within 30 days to protect farmers from uncontrolled market fluctuations.
b) Credit transactions for agricultural produce purchases will be mandatorily settled within 25 days, with interest penalties for overdue payments. A National Agricultural Market Information System will provide daily price information to farmers via SMS/digital means. Weekly agricultural markets (haat bazaars) will be facilitated at each local government unit. A "One Palika, One Cold Storage Centre" programme will begin. A feasibility study for cold storage in each district in public-private partnership will be completed within 10 days.
c) Soil Health Cards will be provided to farmers operating commercial agricultural farms within three months.
Ongoing
Show Remarks
The government has started the MSP process for major crops and approved Minimum Support Price Guidelines, so that part of the pledge is substantively in place. It has also announced a 25‑day payment rule with interest penalties and promised daily price information via a National Agricultural Market Information System, building on the existing AMPIS platform, but there is no evidence yet of systematic enforcement of the 25‑day rule or a fully upgraded SMS‑based service at scale. Weekly haat bazaars in every local government and the “One Palika, One Cold Storage Centre” programme (with district‑level feasibility studies supposedly done in 10 days) remain largely at the policy and planning stage, with no sign that these very tight deadlines have been met nationwide. Soil Health Cards for commercial farmers have been announced with a three‑month target, but rollout so far is described as a plan rather than documented coverage, so this component is still at an early implementation stage.
Process To Set Wheat Support Price Begins
Farmers To Get Timely Payment As Govt Plans Msp For Crops Within 30 Days 16 65
Farmers To Be Given Soil Health Cards
देशभरका भूमिहीन सुकुम्बासी तथा अव्यवस्थित बसोबासीको एकीकृत डिजिटल लगत सङ्कलन तथा प्रमाणीकरण ६० दिनभित्र सम्पन्न गर्ने र भूमिहीन सुकुम्बासी तथा अव्यवस्थित बसोबासी समस्या १००० दिनभित्र समाधान गर्न स्थानीय तहको समन्वयमा घर परिवार सर्वेक्षण सञ्चालन गर्ने, वास्तविक लाभार्थी पहिचानका लागि स्पष्ट मापदण्ड (कट-अफ मिति, आय स्तर, अन्य सम्पत्ति स्वामित्व) लागू गर्ने, सार्वजनिक, ऐलानी तथा गुठी जग्गाको अभिलेख अद्यावधिक, नक्साङ्कन तथा Geographic Information System – GIS आधारित डिजिटल डाटाबेस तयार गर्ने, पहिचान भएका वास्तविक सुकुम्बासीलाई चरणबद्ध रूपमा जग्गा उपलब्ध गराउने वा घना शहरी क्षेत्रमा वैकल्पिक रूपमा एकीकृत आवास (Land Pooling / Apartment Model) मार्फत पुनर्वासको व्यवस्था मिलाउने। जग्गा वितरण तथा पुनर्वास प्रक्रियालाई पूर्णतः पारदर्शी बनाउन सार्वजनिक ड्यासबोर्ड सञ्चालन गर्ने तथा सम्पूर्ण कार्यक्रमको समन्वय, अनुगमन र कार्यान्वयन सम्बन्धित मन्त्रालयको प्रत्यक्ष निगरानीमा सञ्चालन गर्ने। An integrated digital registry of landless squatters and unorganised settlers nationwide will be completed within 60 days. Their problems will be resolved within 1,000 days through household surveys in coordination with local governments, with clear eligibility criteria, GIS-based land databases, and phased land allocation or alternative housing (land pooling/apartment model). A public dashboard will ensure full transparency. Timeline; 60 days Ongoing
Show Remarks
The government has begun implementing Point 91 by preparing and launching an integrated digital data‑collection system for landless squatters and unorganised settlers (starting in Kathmandu) and has outlined a 1,000‑day plan with eligibility criteria, GIS‑based land records, phased housing and a transparency dashboard, the full plan remains at an early rollout and design stage, and the process is already highly contested, with landless groups protesting that evictions are moving faster than fair verification and resettlement.
Govt To Launch Integrated Digital Database Of Squatters In Kathmandu 86 96
Landless Groups Question Government S Commitment To Resolving Land Issues
सार्वजनिक जग्गाको संरक्षण तथा अतिक्रमण नियन्त्रण गर्न डिजिटल अभिलेख तयार गर्ने, निगरानी प्रणाली सुदृढ गर्ने तथा अवैध कब्जा हटाउने कार्य तत्काल प्रारम्भ गर्ने। नयाँ अतिक्रमणमा कडाइका साथ रोक लगाउने र अवैध कब्जा हटाउने विशेष अभियान सञ्चालन गर्ने। नेपाल बाल सङ्गठनसम्बन्धी उच्चस्तरीय जाँचबुझ आयोग (हरिबाबु आयोग) को प्रतिवेदन बमोजिम बाल सङ्गठनको जग्गा अतिक्रमण तथा हिनामिनासम्बन्धी अनुसन्धान १५ दिनभित्र सुरु गर्ने। Digital records will be created to protect public land from encroachment, monitoring systems will be strengthened, and illegal occupation will be removed immediately. An investigation into the land encroachment and deeds related to the Nepal Children's Organisation — per the recommendations of the Haribaabu Commission — will begin within 15 days. Timeline: 15 days Not Started
Show Remarks
The government has launched a campaign to digitise public‑land records and begun a nationwide drive to clear encroached public land. Digital land‑record and GIS work has clearly started, but it is early and uneven; there is no sign that a complete digital registry of public land and encroachments has been created nationwide within 15 days. The government has also initiated the Bal Mandir/Nepal Children’s Organisation land probe in line with Haribaabu Commission recommendations, but digital land registries and monitoring remain incomplete.
The Bal Mandir Land Scandal From Charity Land To Corruption Case
Details Of Encroachment Of Government Land Being Sought In Tanahun
Other Strategic and Social Protection Decisions (2 completed, 3 ongoing)
कसूरजन्य सम्पत्ति व्यवस्थापन प्रक्रियालाई सरल, सहज बनाउन र एकरूपता कायम गर्न कसूरजन्य सम्पत्ति (रोक्का, नियन्त्रण र जफत) नियमावली दुई महिनाभित्र संशोधन गर्ने। The Crime Proceeds (Freezing, Control, and Confiscation) Regulations will be amended within two months to simplify and standardise processes for managing crime-related assets. Ongoing
Show Remarks
The government has tightened Nepal’s anti‑money laundering and asset‑freezing framework through amendments to the Asset (Money) Laundering Prevention Rules and a Third Amendment Ordinance expanding the Department of Money Laundering Investigation’s powers, but there is no public evidence that the specific ‘Crime Proceeds (Freezing, Control, and Confiscation) Regulations’ have been amended within two months as promised to simplify and standardise crime‑asset management procedures.
Nepal Expands Anti Money Laundering Net Financial Crimes Insider Trading Now…
नेपाल प्रहरीको केन्द्रीय अनुसन्धान ब्यूरो (CIB) लाई प्रविधियुक्त बनाउन तत्कालै कम्तीमा १ करोड रुपैयाँ उपलब्ध गराउने। At least NPR 1 crore will be immediately made available to the Central Investigation Bureau (CIB) of Nepal Police to upgrade its technological capabilities. Not Started
Show Remarks
No clear information on whether this was implemented.
अन्तर्राष्ट्रिय तथा क्षेत्रीय सङ्कटहरूको प्रभाव अध्ययन गर्न अन्तर-मन्त्रालय कार्यदल गठन गर्ने, सोको आधारमा आवश्यक नीति तथा रणनीति तयार गर्ने कार्य परराष्ट्र मन्त्रालयको संयोजकत्वमा ३० दिनभित्र सम्पन्न गर्ने। मध्यपूर्वका देशहरूमा विकसित हुँदै गएको परिस्थितिका कारण नेपालमा आर्थिक, वैदेशिक रोजगारी, आपूर्ति शृङ्खला, ऊर्जा तथा सामाजिक क्षेत्रमा पर्न सक्ने बहुआयामिक प्रभावहरूको समयमै मूल्याङ्कन तथा व्यवस्थापन गर्न सम्बन्धित मन्त्रालयहरू (परराष्ट्र, श्रम, अर्थ, उद्योग, आपूर्ति, ऊर्जा लगायत) को प्रतिनिधित्व रहने गरी एक उच्चस्तरीय अन्तर-मन्त्रालय अध्ययन कार्यदल गठन गर्ने। उक्त कार्यदलले विस्तृत अध्ययन गरी ७ (सात) दिनभित्र अल्पकालीन, मध्यकालीन तथा दीर्घकालीन नीतिगत तथा कार्यक्रमगत उपायहरू सहित प्रतिवेदन पेश गर्ने। सो प्रतिवेदनका आधारमा आवश्यक निर्णय तथा कार्यान्वयन प्रक्रिया तत्काल अघि बढाउने। An inter-ministry task force will be formed to study the impact of international and regional crises — particularly multidimensional effects of evolving Middle East developments on Nepal's economy, remittances, supply chains, energy, and social sectors. It will submit a report with short-, medium-, and long-term policy recommendations within 7 days. Timeline: 7 days Completed
Show Remarks
The government has formed the Foreign Minister–led inter‑ministerial task force on the West Asia crisis and the panel has submitted a substantive report with short‑, medium‑ and long‑term recommendations (including a permanent crisis‑coordination mechanism and strategies for evacuation, remittances and energy) (However, the report was delivered weeks after formation rather than within the 7‑day deadline set in the pledge.)
Task Force Formed Under The Coordination Of The Minister Of Foreign Affairs…
भन्सारमा थन्किएका सवारी साधनहरूको विवरण सङ्कलन गरी तिनीहरूको प्रयोग, व्यवस्थापन वा लिलामी गर्ने व्यवस्था तत्काल मिलाउने। Details of vehicles held up at customs will be collected, and arrangements for their use, management, or auction will be made immediately. Not Started
Show Remarks
While the commitment is recorded and customs bottlenecks are widely reported, there is no public evidence yet of a completed inventory or a systematic programme of re‑use or auction of such vehicles being carried out under this pledge.
महिलाहरूको सुरक्षित आवागमन सुनिश्चित गर्न सातै प्रदेशमा निःशुल्क “ब्लु बस” सेवा सञ्चालन गर्ने। पहिलो चरणमा १०० दिन भित्र कम्तीमा २५ वटा बस सञ्चालनमा ल्याउने। Free "Blue Bus" services will be operated in all seven provinces to ensure safe mobility for women. In the first phase, at least 25 buses will be in operation within 100 days. Not Started
Show Remarks
The government has approved a plan to operate free ‘Blue Bus’ services for women in all seven provinces and has set a target of deploying at least 25 such buses within the first 100 days, but available reporting still describes the initiative as a planned or forthcoming service, with no clear evidence yet that 25 Blue Buses are actually in operation across provinces within the 100‑day window.
When Will The Blue Bus Network Be Launched In All Seven Provinces 37 55
Blue Bus In All Seven Provinces Will The Fate Of Drut Bus Repeat Itself Or…
सार्वजनिक यातायातमा हुने लैङ्गिक हिंसा रोकथाम गर्न सबै सवारी साधनमा CCTV/Dashcam जडान गर्ने र राइड-शेयरिङ एपहरूमा SOS Button अनिवार्य गरी आकस्मिक तथा खतराको सूचना प्रहरीसम्म तत्काल पुग्ने व्यवस्था मिलाउने कार्य ३० दिनमा सम्पन्न गर्ने। To prevent gender-based violence in public transport, CCTV/dashcams will be installed in all vehicles, and an SOS Button will be made mandatory in ride-sharing apps so emergency alerts reach police immediately. This will be completed within 30 days. Timeline 30 days Ongoing
Show Remarks
The government has decided to mandate CCTV/dashcams in public transport vehicles and SOS emergency features in ride‑sharing apps and has embedded these requirements in the new Digital Mobility Service Operation Standards 2026 and related directives, but there is no evidence that CCTV/dashcams have been installed in all vehicles or that SOS functions are fully deployed and operational across all ride‑sharing platforms within the promised 30‑day period.
Cctv Installation Begins In Public Vehicles Across Kathmandu Valley
Balen Government Unveils 5 Key Transport Reforms In First Cabinet Meeting
सहकारीका साना बचतकर्ताहरूको बचत फिर्ताको प्रक्रिया १०० दिनभित्रै सुरु गर्ने। The process of refunding savings to small cooperative depositors will begin within 100 days. Timeline: will start from 3rd week of may Ongoing
Show Remarks
On May 18, 2026, the committee actually began refunds, returning around Rs 1.4 million to 378 small depositors (up to Rs 10,000 each) from three problematic cooperatives, marking the first phase of the refund process.The plan now is to refund about 18,000 depositors with up to Rs 10,000 in savings in full in the first phase, and then proceed in phases with caps (Rs 50,000, 100,000, 200,000, 500,000, 1 million) returning 50 percent at each stage, with a goal of clearing up to roughly Rs 500,000 per depositor within a year.
Government To Begin Refunding Victims Of Problematic Cooperative From Mid M…
Government Begins Refunding Deposits To Victims Of Problematic Cooperatives
Rising Nepal Daily
आम निर्वाचन २०८२ को जनादेश, नेपालको संविधानको मूल मर्म र राजनीतिक दलहरूले जनतासमक्ष प्रस्तुत गरेका प्रतिबद्धताहरूको प्रभावकारी कार्यान्वयनका लागि नेपाल सरकार, प्रदेश तथा स्थानीय सरकार, संवैधानिक निकायहरू, निजामती प्रशासन, नेपाली सेना लगायत सबै सुरक्षा निकाय, सार्वजनिक सेवा प्रवाह गर्ने निकायहरू, राजनीतिक दलहरू, निजी क्षेत्र, गैरसरकारी क्षेत्र, नागरिक समाज तथा विकास साझेदारहरूले एकताबद्ध भई नतिजामूलक सहकार्य गर्ने र सो सहकार्यलाई संस्थागत तथा परिणाममुखी बनाउन आवश्यक नीतिगत, संरचनात्मक तथा कार्यक्रमगत व्यवस्था मिलाउने। साथै, उक्त साझा राष्ट्रिय दायित्व निर्वाहमा सबै सरोकारवालालाई सक्रिय, समन्वित र उत्तरदायी भूमिका निर्वाह गर्न हार्दिक आह्वान गर्ने। For the effective implementation of the mandate of the 2082 general elections, the spirit of Nepal's Constitution, and the commitments made by political parties to the people — the Government of Nepal makes a heartfelt appeal to all: the federal, provincial, and local governments; constitutional bodies; the civil service; the Nepal Army and all security forces; public service delivery entities; political parties; the private sector; NGOs; civil society; and development partners — to work together in a result-oriented manner, with the necessary policy, structural, and programmatic arrangements to institutionalise and make this shared national duty effective Completed